It is likely that equipment will break down frequently.
It is likely that equipment will break down infrequently.
It shows that maintenance is performed on an as needed basis.
It shows that there are frequent crises when it comes to maintaining equipment.
第1题:
保养预防(Maintenance Preventive,简称M.P)是将设备改善从()(Easy Maintenance)演进到一开始就将设备设计成()(Maintenance Free)。
第2题:
An AIX server will not boot in normal mode and the server must be booted into maintenance mode to rebuild the boot logical volume. A NIM master is not defined in this environment. How is the system booted into maintenance mode to perform this task ()
第3题:
A. to prevent the creation of an excessive number of scheduler job classes
B. to allow the Automated Maintenance Tasks to use system resources without any restriction
C. to allow resource sharing only among the Automated Maintenance Tasks in the maintenance window
D. to prevent the Automated Maintenance Tasks from consuming excessive amounts of system resources
第4题:
A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and have to be ordered. What is the status of the work order, after a maintenance manager has approved the work order? ()
第5题:
A system administrator has just installed a new maintenance level, but "oslevel -r" does not show the correct maintenance level. What command can be used to determine which filesets are downlevel?()
第6题:
Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()
第7题:
以发展顺序来看,以下对TPM排序正确的是:()。 ①PvM(预防保养,Preventive Maintenance) ②B.M(事后保养,Break-down Maintenance) ③P.M(生产保养,Productive Maintenance) ④PdM(预知保养,Predictive Maintenance) ⑤M.P(保养预防,Maintenance Prevention) ⑥TPM(全面生产经营系统,Total Productive Management system) ⑦TPM(全员生产保养,Total Productive Maintenance) ⑧C.M(改良保养,Corrective Maintenance)
第8题:
In determining the scope of cable to be used when anchoring, what would NOT be considered__________.
A.Depth of the water
B.Character of the holding ground
C.maintenance cost for the chain
D.Type of anchor cable
第9题:
A company just hired a new plant maintenance manager, and they are concerned about the number of corrupt asset records in the present system. In future they want to prevent this from happening. When implementing the new solution, what is recommended?()
第10题:
A customer's plant maintenance manager invites a solution advisor to discuss Enterprise Asset Management in general and how it might help the maintenance group work more effectively and efficiently. What should the solution advisor do in the first meeting with the plant maintenance manager?()