软考中级

Perform. Quality Control is the process of monitoring and recording results of executing the Quality Plan activities to assess performance and recommend necessary changes. ______ are the techniques and tools in performing quality control.. ① Statistical s

题目

Perform. Quality Control is the process of monitoring and recording results of executing the Quality Plan activities to assess performance and recommend necessary changes. ______ are the techniques and tools in performing quality control.. ① Statistical sampling ② Run chart ③ Control charts ④ Critical Path Method ⑤ Pareto chart ⑥ Cause and effect diagrams

A.①②③④

B.②③④⑤

C.①②③⑤⑥

D.①③⑤⑥

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

33 Scope reporting is the timely determination, _____, and _____ of project progress, status data, and transforming this into structured documentation (reports) necessary to judge project performance (reporting on work packages).

A. Recording, accumulation.

B. Recording, graphical display.

C. Accumulation, graphical display.

D. Graphical display, interpretation.

E. Interpretation, analysis


正确答案:A

第2题:

_________

[A] deliver [B] carry [C] perform. [D] apply


正确答案:C

第3题:

Scope reporting is the timely determination, _____, and _____ of project progress, status data, and transforming this into structured documentation (reports) necessary to judge project performance (reporting on work packages).

A.Recording, accumulation.

B.Recording, graphical display.

C.Accumulation, graphical display.

D.Graphical display, interpretation.

E.Interpretation, analysis.


正确答案:A
A

第4题:

当你输入95时,下列程序运行的结果是 results = int(input('成绩为:')) if 100>=results>=90: print('A') elif 90>results>=75: print('B') elif 0<=results<75: print('C') else: print('输入错误!')

A.A

B.B

C.C

D.输入错误!


B

第5题:

Project work packages are typically
decomposed into smaller components called activities to provide a basis for ( ) , scheduling, executing, and
monitoring and controlling the project work.

A.reviewing
B.estimating
C.auditing
D.expecting

答案:B
解析:

第6题:

Project work packages are typically decomposed into smaller components called activities to provide a basis for()scheduling, executing, and monitoring and controllingthe proj ect work.

A.reviewing

B.estimating

C.auditing

D.expecting


参考答案:B

该题的关键词为"scheduling、executing、monitoring、controlling",其语句结构为‘‘Project work packages(主语)are typically decomposed into(谓语)smaller components",含义为"项目工作包通常被分解为更小的活动",分析后得知空白处的选项应该和上述的关键词为并列的词语,且顺序排列在其他的关键词之前,因而只能选择选项B,因为只有首先进行项目估算,才能制定项目进度,然后才能执行和监控,其他选项不符合题意。

第7题:

A transport layer protocol has several responsibilities. One is to create a process-to-process (program-to-program) communication; TCP uses port (71) to accomplish this. Another responsibility of a transport layer protocol is to create a (72) and error-control mechanism at the transport level. TCP uses a sliding (73) protocol to achieve flow control. It uses the acknowledgment packet, time-out, and retransmission to achieve (74) control. The transport layer is also responsible for providing a connection mechanism for the application program. The application program sends (75) of data to the transport layer. It is the responsibility of the transport layer at the sending station to make a connection with the receiver.

(71)

A.numbers

B.connections

C.diagrams

D.resources


正确答案:A

第8题:

151 Scope reporting is the timely determination, _____, and _____ of project progress, status data, and transforming this into structured documentation (reports) necessary to judge project performance (reporting on work packages).

A. Recording, accumulation.

B. Recording, graphical display.

C. Accumulation, graphical display.

D. Graphical display, interpretation.

E. Interpretation, analysis


正确答案:A

第9题:

15、自由变换命令可以对图像进行缩放、旋转、倾斜、透视等变形操作,执行该命令的快捷键是?

A.control键+R键

B.control键+D键

C.control键+T键

D.control键+Z键


C

第10题:

自由变换命令可以对图像进行缩放、旋转、倾斜、透视等变形操作,执行该命令的快捷键是?

A.control键+R键

B.control键+D键

C.control键+T键

D.control键+Z键


control 键+T键