第1题:
● On some projects, especially ones of smaller scope, activity sequencing, activity resource estimating, activity duration estimating, and (70) are so tightly linked that they are viewed as a single process that can be performed by a person over a relatively short period of time.
A.time estimating
B.cost estimating
C.project planning
D.schedule development
第2题:
A.individual students learning
B.several students learning
C.a group of students learning
D.the whole students learning
第3题:
Which of the following activities can be considered as part of risk mitigation
A risk identification
B purchasing insurance
C assessment of outcomes
D assessment of probabilities
E C and D only
第4题:
第5题:
( ) can be considered as part of risk mitigation.
A.Risk identification
B.Purchasing insurance
C.Assessment of outcomes
D.Assessment of probabilities
第6题:
Which order of steps is followed in carrying out the project?
A. Assessment-Prototype-Design-Construction.
B. Assessment-Design-Prototype-Construction.
C. Design-Assessment-Prototype-Construction.
D. Design-Prototype-Assessment-Construction.
第7题:
The most crucial time for project risk assessment is (75) .
A.when a problem surfaces
B.during the planning phase
C.during the close-out phase
D.after the project schedule has been published
第8题:
184 Which of the following activities can be considered as part of risk mitigation
A. risk identification
B. purchasing insurance
C. assessment of outcomes
D. assessment of probabilities
E. C and D only
第9题:
On some projects,especially ones of smaller scope,activity sequencing,activity resource estimating.Activity duration estimating,and (71) are so tightly linked that they are viewed as a single process that can be performed by a person over a relatively short period of time.
A.project planning
B.time estimating
C.cost estimating
D.schedule development
第10题: