Assessment is viewed as an integral part of the teaching-learning process. It involves collecting evidence of learning over a period of time, using a variety of assessment methods. The goals of assessment are to provide _____on both the on-going progress and the end-product in achieving the standards.

A.situations
B.tasks
C.feedback
D.knowledge
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

● On some projects, especially ones of smaller scope, activity sequencing, activity resource estimating, activity duration estimating, and (70) are so tightly linked that they are viewed as a single process that can be performed by a person over a relatively short period of time.

A.time estimating

B.cost estimating

C.project planning

D.schedule development


正确答案:D

第2题:

Assessment is concerned with _______.

A.individual students learning

B.several students learning

C.a group of students learning

D.the whole students learning


正确答案:A

第3题:

Which of the following activities can be considered as part of risk mitigation

A risk identification

B purchasing insurance

C assessment of outcomes

D assessment of probabilities

E C and D only


正确答案:B

第4题:

Learning portfolio is an important means of__________.

A.summative assessment
B.formative assessment
C.diagnostic assessment
D.whole period assessment

答案:C
解析:
本题考查教学评价。

教学评价的目的在于获得反馈信息,以帮助教师改进教学。综上,C选项正确。

A选项,情况,不合题意,故排除。

B选项,任务,不合题意,故排除。

D选项,知识,不合题意,故排除。

故正确答案为C项。

第5题:

( ) can be considered as part of risk mitigation.

A.Risk identification

B.Purchasing insurance

C.Assessment of outcomes

D.Assessment of probabilities


正确答案:D
对风险事件的概率进行估计可以看作是风险减轻的一部分。

第6题:

Which order of steps is followed in carrying out the project?

A. Assessment-Prototype-Design-Construction.

B. Assessment-Design-Prototype-Construction.

C. Design-Assessment-Prototype-Construction.

D. Design-Prototype-Assessment-Construction.


正确答案:D

第7题:

The most crucial time for project risk assessment is (75) .A.when a problem surfacesSXB

The most crucial time for project risk assessment is (75) .

A.when a problem surfaces

B.during the planning phase

C.during the close-out phase

D.after the project schedule has been published


正确答案:A
项目风险评估最重要的时间是:当问题呈现时在规划阶段在收尾阶段在项目进度发布后

第8题:

184 Which of the following activities can be considered as part of risk mitigation

A. risk identification

B. purchasing insurance

C. assessment of outcomes

D. assessment of probabilities

E. C and D only


正确答案:B

第9题:

On some projects,especially ones of smaller scope,activity sequencing,activity resource estimating.Activity duration estimating,and (71) are so tightly linked that they are viewed as a single process that can be performed by a person over a relatively short period of time.

A.project planning

B.time estimating

C.cost estimating

D.schedule development


正确答案:D

第10题:

Which of the following is NOT true about the assessment in language teaching?

A.Testing does not equate with assessment.
B.Summative assessment focuses on the process of learning.
C.The students themselves should be given the chance to evaluate their own performance.
D.Assessment means to discover what the learners know and can do at certain stage of the learning process.

答案:B
解析:
考查教学评价。形成性评价(formative assessment)关注学习的过程,而不是终结性评价(summative assessment)。