During the planning stage of cargo operations,stress and displacement calculations should be carried out at incremental steps commensurate with the number of _____ and loading sequence of the proposed operation.
A.coefficient of loading
B.stowage factors
C.orders
D.pours
第1题:
Which statement(s) is/are TRUE concerning crane cargo operations?
A.Do not exceed rated load capacity of crane and container spreader or slings
B.During any cargo handling operation,the safety of personnel is paramount
C.Cargo handlers must be outfitted with adequate protection from personal injury
D.All the above
第2题:
During cargo operations,your vessel develops a list due to the center of gravity rising above the transverse metacenter.To correct the list,you should ______.
A.Shift weight to the high side
B.Shift weight to the centerline
C.Add weight in the lower holds or double bottoms
D.Remove weight from the lower holds or double bottoms
第3题:
Ropes of wires attached to derricks to prevent them from swinging during cargo handling operations are ______.
A.Preventers
B.Side ropes
C.Stays
D.Guide lines
第4题:
第5题:
During which condition should be operator of a pedestal crane shutdown operations?
A.Bunkering
B.High winds
C.Potable water spill on deck
D.More than 3°list
第6题:
Which safety precaution(s)should be observed during crane operations ________.
A.Checking for proper lifting from beneath the load during cargo operations
B.Using the proper slings or other lifting devices during cargo operations
C.Relaying communications to port agents on the pier during cargo hoists
D.All of the above
第7题:
A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.
A.Cargo has been loaded or discharged
B.Cargo hose is connected
C.Cargo pumps are started
D.Vessel is ready to handle cargo
第8题:
When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to ______.
A.remove an existing list that would slow down cargo operations
B.initiate loading in conjunction with unloading at the hatch
C.improve stability during cargo operations
D.allow longshoremen easy access to the hatch
第9题:
第10题:
allow greater than normal loads to be handled by the gear
act as an inboard guy in the event the inboard guy parts during cargo handling
assist the outboard guy in supporting stresses during cargo handling
prevent the inboard guy from parting due to stresses during cargo handling