The engineer ______ the watch to the relieving officer if there is reason to believe that the latter is obviously not capable of carrying out the watch-keeping duties effectively.
A.shall take over
B.shall not take over
C.shall hand over
D.shall not hand over
第1题:
What must be handed over to relieving Engineer Officer at transition of change command?
第2题:
STCW78/95 Convention states that the officer in charge of the engineering watch is the representative
A.ship-owner's
B.master's
C.chief engineer's
D.manager's
第3题:
第4题:
Do not______the watch to the relieving officer until he has verbally expressed his acknowledgment of the information which has been passed by the officer handing over.
A.turn over
B.hand over
C.hands off
D.take over
第5题:
At an unsheltered(开放的) anchorage the chief engineer officer shall consult with ______whether or not to maintain an underway watch.
A.the engineer officer in charge of watch
B.the deck officer in charge of watch
C.the master
D.the chief mate
第6题:
At an unsheltered anchorage the chief engineer officer shall consult with_______whether or not to maintain an underway watch
A.the engineer officer in charge of watch
B.the deck officer in charge of watch
C.the master
D.the chief mate
第7题:
I am the relieving/ in-coming third officer, here is my ID card.
第8题:
When will an Engineer Officer in charge of watch call Chief Engineer?
第9题:
The Company should establish in the SMS that ______has the overriding authority and the responsibility to make decisions with respect to safety and pollution prevention.
A.the master
B.the chief engineer
C.the officer on duty
D.the engineer in charge of watch
第10题:
When a ship is in port, who will keep gangway watch?()