其他

Which two partitioned table maintenance operations support asynchronous Global Index Maintenance inOracle database 12c?()A. ALTER TABLE SPLIT PARTITIONB. ALTER TABLE MERGE PARTITIONC. ALTER TABLE TRUNCATE PARTITIOND. ALTER TABLE ADD PARTITIONE. ALTER TABL

题目
Which two partitioned table maintenance operations support asynchronous Global Index Maintenance inOracle database 12c?()

A. ALTER TABLE SPLIT PARTITION

B. ALTER TABLE MERGE PARTITION

C. ALTER TABLE TRUNCATE PARTITION

D. ALTER TABLE ADD PARTITION

E. ALTER TABLE DROP PARTITION

F. ALTER TABLE MOVE PARTITION

参考答案和解析
参考答案:C, E
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

156 Life cycle costing is the total cost to the customer for the acquisition and ownership over its full life. Life cycle costing categories include the cost of _____, _____, and _____.

A. R & D, maintainability, operation and support.

B. R & D, production, operation and support.

C. Acquisition, operations, maintenance.

D. Production, operations, maintenance.

E. None of the above


正确答案:B

第2题:

()meanssayingsorrytosomeonethatyou’vehurtthemorcausedtroubleforthem.

A.Delay

B.Apologize

C.Inconvenience

D.Maintenance


正确答案:B

第3题:

Life cycle costing is the total cost to the customer for the acquisition and ownership over its full life. Life cycle costing categories include the cost of _____, _____, and _____.

A . R & D, maintainability, operation and support.

B . R & D, production, operation and support.

C . Acquisition, operations, maintenance.

D . Production, operations, maintenance.

E . None of the above


正确答案:C

第4题:

The term “software( )" is used to describe the software engineering activities that occur following delivery of a software product to the customer.

A.analysis
B.design
C.implementation
D.maintenance

答案:D
解析:

第5题:

Software ( )activities involve making enhancements to software products ,adapting products to new environments ,and correcting problems.

A. analysis B. design C. coding D. maintenance


正确答案:D

第6题:

___________

[A] life

[B] existence

[C] survival

[D] maintenance


正确答案:C

第7题:

( )refers to the process of testing and then eliminating errors.

A. Debugging B. Programming C. Analysis D. Maintenance


正确答案:A

第8题:

74 Life cycle costing is the total cost to the customer for the acquisition and ownership over its full life. Life cycle costing categories include the cost of _____, _____, and _____.

A. R & D, maintainability, operation and support.

B. R & D, production, operation and support.

C. Acquisition, operations, maintenance.

D. Production, operations, maintenance.

E. None of the above


正确答案:B

第9题:

Software engineers apply the principles of software engineering to the design, development, ( ),testing, and evaluation of the software and systems that make computers or anything containing software work.

A.Requirement

B.construction

C.service

D.maintenance


正确答案:D

第10题:

(75)refers to the process of testing and then eliminating errors.

A.Debugging
B.Programming
C. Analysis
D.Maintenance

答案:A
解析:
调试指的是测试并纠错的过程。