项目管理师

● The scope of a project can be expected to change if:A The project manager must provide cost estimates without having a design conceptB Oversimplification (underestimating) of the nature of the work occursC The project manager is assigned after the proje

题目

● The scope of a project can be expected to change if:

A The project manager must provide cost estimates without having a design concept

B Oversimplification (underestimating) of the nature of the work occurs

C The project manager is assigned after the project is defined, and the cost and schedule are approved

D A clear objective is not provided

E All of the above are possible based upon the situation

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

以下关于Openstack租户Project说法错误的是()。

A、一个Project资源集合可供多个用户使用

B、Project是Openstack各个服务中的一些可以访问的资源集合

C、网络云各Project采用硬件共享,逻辑隔离的方式

D、租户是一个有身份验证信息的API实体


答案:B

第2题:

Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.

A.risk

B.problem

C.result

D.data


正确答案:A
风险是一个不确定因素或条件,如果它一旦发生,可能对至少一个项目目标,如项目进度、项目成本、项目范围或项目质量产生负面或正面的影响。选项A是风险,选项B是问题,选项C是结果,选项D是数据。根据项目风险定义,风险包括两方面含义:一是未实现目标;二是不确定性。因此应选择A。

第3题:

● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.

(71)

A.risk

B.problem

C.result

D.data


正确答案:A

第4题:

Project( )is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.

A.risk
B.problem
C.result
D.data

答案:A
解析:
风险不是一个不确定因素或条件,如果它一旦发生,可能对至少一个项目目标,如项目进度、项目成本、项目范围或项目质量产生负面或正面的影响。选项A是风险,选项B是问题,选项C是结果,选项D是数据。根据项目风险定义,风险包括两方面含义:一是未实现目标;二是不确定性。因此应选择A。

第5题:

---- Look! The man at the gate ________ be our headmaster. He is always standing there every morning.

--- - No, it ________ be him. He is holding a meeting in the office now.

A.must, can’t B.must, mustn’t C.can’t, can’t D.can’t, mustn’t


正确答案:A

第6题:

—_______ I return the book to the library this week?— No, you _______.You can keep it until the end of this month.

A.Must; needn’t

B.Can; can’t

C.May; mustn’t

D.Can; mustn’t


答案:A

第7题:

中国青少年发展基金会在网上的主页地址是()。

A.http://project-hopE.cydF.gov.cn

B.http://project-hopE.cydF.ac

C.http://project-hopE.cydF.edu.cn

D.http://project-hopE.cydF.com.cn


参考答案:C

第8题:

Project ______is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.

A.risk

B.problem

C.result

D.data


正确答案:A
解析:风险是一个不确定因素或条件,如果它一旦发生,可能对至少一个项目目标,如项目进度、项目成本、项目范围或项目质量产生负面或正面的影响。选项A是风险,选项B是问题,选项C是结果,选项D是数据。根据项目风险定义,风险包括两方面含义:一是未实现目标;二是不确定性。因此应选择A。

第9题:

Project()is an uncertain event or condition that,if it occurs,has a positiveor a negative effect on at least one project objective,such as time,cost,scope, or quality.

A.risk
B.problem
C.result
D.data

答案:A
解析:
风险是一个不确定因素或条件,如果它一旦发生,可能对至少一个项目目标,如项目进度、项目成本、项目范围或项目质量产生负面或正面的影响。选项A 是风险,选项B 是问题,选项 C 是结果,选项 D 是数据。根据项目风险定义,风险包括两方面含义:一是未实现目标;二是不确定性。因此应选择 A

第10题:

以下选项中哪个选项是根路径的表达方法?

A.D:/Program Files/.Net/Project1

B./root/.Net/Project1

C../home/.Net/Project1

D.file://D:/Program Files/.Net/Project1


root/.Net/Project1