● The scope of a project can be expected to change if:
A The project manager must provide cost estimates without having a design concept
B Oversimplification (underestimating) of the nature of the work occurs
C The project manager is assigned after the project is defined, and the cost and schedule are approved
D A clear objective is not provided
E All of the above are possible based upon the situation
第1题:
A、一个Project资源集合可供多个用户使用
B、Project是Openstack各个服务中的一些可以访问的资源集合
C、网络云各Project采用硬件共享,逻辑隔离的方式
D、租户是一个有身份验证信息的API实体
第2题:
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
A.risk
B.problem
C.result
D.data
第3题:
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.
(71)
A.risk
B.problem
C.result
D.data
第4题:
第5题:
---- Look! The man at the gate ________ be our headmaster. He is always standing there every morning.
--- - No, it ________ be him. He is holding a meeting in the office now.
A.must, can’t B.must, mustn’t C.can’t, can’t D.can’t, mustn’t
第6题:
A.Must; needn’t
B.Can; can’t
C.May; mustn’t
D.Can; mustn’t
第7题:
A.http://project-hopE.cydF.gov.cn
B.http://project-hopE.cydF.ac
C.http://project-hopE.cydF.edu.cn
D.http://project-hopE.cydF.com.cn
第8题:
Project ______is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
A.risk
B.problem
C.result
D.data
第9题:
第10题:
以下选项中哪个选项是根路径的表达方法?
A.D:/Program Files/.Net/Project1
B./root/.Net/Project1
C../home/.Net/Project1
D.file://D:/Program Files/.Net/Project1