72 Project trade-offs vary between
A. risk, cost and schedule.
B. direct cost, indirect cost, and resource availability
C. quality, schedule and time
D. cost, quality and schedule
E. contract terms, scope and budget
第1题:
85 Project tradeoffs are usually made by comparing _____ and constraints.
A. Time, cost, and quality
B. Time, risk, and quality
C. Risk, quality, and manpower availability
D. Cost, quality, and technical performance
E. Cost, quality, and risk
第2题:
CNP支持的传播模型是:
A.SPM
B.Cost231-Hata
C.Cost-Hata
D.通用宏小区模型
第3题:
3 Project tradeoffs are usually made by comparing _____ and constraints.
A. Time, cost, and quality
B. Time, risk, and quality
C. Risk, quality, and manpower availability
D. Cost, quality, and technical performance
E. Cost, quality, and risk
第4题:
第5题:
第6题:
139 Which of the following are types of status reports?
A. document, variance, trend and exception
B. cost, trend, schedule and acquisition
C. cost, schedule, technical performance
D. analysis, cost, performance and schedule
E. All of the above
第7题:
A.OE1不计算OSPF内部COST值
B.OE2不计算OSPF内部COST值
C.ON1不计算OSPF内部COST值
D.ON2计算OSPF内部COST值
第8题:
57 Which of the following are types of status reports?
A. document, variance, trend and exception
B. cost, trend, schedule and acquisition
C. cost, schedule, technical performance
D. analysis, cost, performance and schedule
E. All of the above.
第9题:
第10题:
以下关于VDB函数的语法正确的是()。
A.VDB(cost,salvage,life,period,factor)
B.VDB(cost,salvage,life,period,month)
C.VDB(cost,salvage,life,per)
D.VDB(cost,salvage,life,start-period,end-period,factor,no-switch)