101 Using the situation stated in the Special window, which WBS element is behind schedule but under budget?A. Element PB. Element QC. Element RD. Element SE. None of the above

题目

101 Using the situation stated in the Special window, which WBS element is behind schedule but under budget?

A. Element P

B. Element Q

C. Element R

D. Element S

E. None of the above

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

2 The Work Breakdown Structure (WBS) is the basis for communicating:

A. Project scope, cost control, schedule, quality

B. Project objectives, dependencies, plan, cost control

C. Project scope, schedule, staffing, cost control

D. Project scope, quality, schedule, dependencies

E. Project budget, schedule, risk factors, work assignments


正确答案:A

第2题:

健康教育计划实施的“SCOPE模 式”中字母“S”所代表的是

A、Study(研究)

B、Schedule (时间表)

C、Solve(解决)

D、Special(专门的)

E、Spend(花费)


参考答案:B

第3题:

The Work Breakdown Structure (WBS) is the basis for communicating:

A.Project scope, cost control, schedule, quality

B.Project objectives, dependencies, plan, cost control

C.Project scope, schedule, staffing, cost control

D.Project scope, quality, schedule, dependencies

E.Project budget, schedule, risk factors, work assignments.


正确答案:A
A

第4题:

下列样式代码中,可精确定义元素位置的是()

A.special{ position: absolute;}

B.special{ position: absolute; top:20px; left:16px;}

C.special{ position: relative;; top:20px; left:16px;}

D.special{ position: relative;}


BC

第5题:

To set the history retention period for either window logging or job logging individually, which parameters of the SET_SCHEDULER_ATTRIBUTE procedure need to be used?()

A. LOG_HISTORY

B. JOB_LOG_RETENTION

C. WINDOW_LOG_RETENTION

D. WHICH_LOG

E. LOG_NAME


参考答案:A, D

第6题:

● The Work Breakdown Structure (WBS) is the basis for communicating:

A Project scope, cost control, schedule, quality

B Project objectives, dependencies, plan, cost control

C Project scope, schedule, staffing, cost control

D Project scope, quality, schedule, dependencies

E Project budget, schedule, risk factors, work assignments.


正确答案:A

第7题:

YouareimplementinganASP.NETpagethatincludesthefollowingdrop-downlist.Youneedtodynamicallyaddvaluestotheendofthedrop-downlist.Whatshouldyoudo?()

A.AddthefollowingOnPreRendereventhandlertotheasp:DropDownList

B.AddthefollowingOnPreRendereventhandlertotheasp:DropDownList

C.Addthefollowingeventhandlertothepagecode-behind.

D.Addthefollowingeventhandlertothepagecode-behind.


参考答案:B

第8题:

120 The Work Breakdown Structure (WBS) is the basis for communicating:

A. Project scope, cost control, schedule, quality

B. Project objectives, dependencies, plan, cost control

C. Project scope, schedule, staffing, cost control

D. Project scope, quality, schedule, dependencies

E. Project budget, schedule, risk factors, work assignments


正确答案:A

第9题:

A) circumstance

B) occasion

C) case

D) situation


正确答案:B
答案:B
[试题分析]固定搭配。
[详细解答]只有occasion与on搭配使用,on this occasion表示“在这个时机,此时”。circumstance(环境,情势)、通常与under连用。case和situation(状况,事态,情势)与in连用。

第10题:

【多选题】下列样式代码中,可精确定义元素位置的是:

A..special{ position: absolute;}

B..special{ position: absolute; top:20px; left:16px;}

C..special{ position: relative;; top:20px; left:16px;}

D..special{ position: relative;}


BC