第1题:
● The purpose of configuration management is to:
A insure drawings are updated
B control change throughout the project
C control change during the production only
D generate engineering change proposals
E inform. the project manager of changes
第2题:
The Perform. Integrated Change Control process is conducted from project lnception through completion and is the ultimate responsibility of the(75)
A.change control board
B. project management office
C.project manager
D.configuration management officer
第3题:
The purpose of configuration management is to:
A.insure drawings are updated
B.control change throughout the project
C.control change during the production only
D.generate engineering change proposals
E.inform. the project manager of changes
第4题:
第5题:
第6题:
The perform. Integrated Change Contorl process is the ultimate responsibility of the(①).Although changes may be initiated verbally,they should be recorded in writtern form. and entered into the (②)system.
①A.resource manager
B.division manager
C.functional manager
D.project manager
②.A.quality management
B.configuration management
C.project manager
D.scope management
参考答案:D,D
第7题:
第8题:
33 The purpose of configuration management is to:
A. insure drawings are updated
B. control change throughout the project
C. control change during the production only
D. generate engineering change proposals
E. inform. the project manager of changes
第9题:
第10题: