信息安全知识竞赛

CMVP(Cryptographic Module Validation Program)评估需要保证安全模块实现的正确性和安全性

题目

CMVP(Cryptographic Module Validation Program)评估需要保证安全模块实现的正确性和安全性

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

What are two benefits of the modular design of the Junos OS?()

A. Each module uses application-specific integrated circuits (ASICs).

B. Each module runs in its own protected memory space.

C. Each module can be individually restarted.

D. Each module is supported across all Junos platforms.


参考答案:B, C

第2题:

CMVP(Cryptographic Module Validation Program)评估有两个目标:保证安全模块实现的正确性和安全性;为模块改进提供帮助。


正确答案:正确

第3题:

Which of the following statements describe the use of the keyword

static?

a) Within the body of a function: A static variable maintains its value

between function revocations

b) Within a module: A static variable is accessible by all functions

within that module

c) Within a module: A static function can only be called by other

functions within that module


正确答案:
 

第4题:

CMVP(Cryptographic Module Validation Program)评估需要为模块改进提供帮助


正确答案:正确

第5题:

()是CMVP(Cryptographic Module Validation Program)必要的先决条件

  • A、通用准则评估和认证计划(CCEVS)
  • B、密码算法正确性检测(CAVP)
  • C、FIPSPUB标准
  • D、NVLAP

正确答案:B

第6题:

重启7600设备某块板卡的命令是()

  • A、module X poweroff
  • B、set module x off
  • C、hardware module x reset
  • D、hw-module module X reset

正确答案:D

第7题:

If the default VDC is configured to limit resources to a specific module type, what happens when a module that does not match the resource type is installed?()     

  • A、 The module is powered up, and interfaces are in an "admin down" state.
  • B、 The module is denied power, and a syslog message is generated.
  • C、 The module is powered up, and interfaces are allocated to VDC0.
  • D、 The module is powered up, and interfaces are allocated to VDC100.

正确答案:C

第8题:

The primary line module has failed and the spare line module is nowactive.What occurs,by default,when the primary line module returns to an operational status?()

A.The primary line module is inactive for five minutes and then becomes active.

B.The primary line module is in standby mode,while the spare line module remains active.

C.The primary line module becomes active immediately and the spare line module becomes inactive.

D.The primary and spare line modules are active for five minutes,after which time the spare line module becomes inactive.


参考答案:B

第9题:

密码算法验证是CMVP(Cryptographic Module Validation Program)的先决条件。


正确答案:正确

第10题:

UML 是()的缩写。

  • A、Unified Module Language
  • B、Unified Modeling Language
  • C、Universal Module Leveling
  • D、Universal Module Language

正确答案:B

更多相关问题