A customer has two Ethernet Switch Modules installed in an IBM BladeCenter Enterprise chassis. The modules were configured identically. The Ethernet module in bay one was inadvertenly reset to factory defaults. Which solution returns the module to the customer-specific configuration?()
第1题:
A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration: (1)two Brocade 20-Port SAN Switch Modules (2)two Nortel Networks 1/10 GB Uplink ESM (3)a redundant AMM What is the minimum number of power supplies needed for this configuration to have full redundancy?()
第2题:
A banking customer has two Ethernet Switch Modules installed in an IBM BCE chassis. The modules were configured identically. The Ethernet module in bay 1 was accidentally reset to factory defaults. Which solution returns the module to the customer-specific configuration? ()
第3题:
A. The ONS 15216 OADM can be provisioned to add/drop one, two, or four channels via Cisco Transport Manager (CTM).
B. The ONS 15216 OADM consists only of a four-channel module, and the number of ports utilized determines whether it is a one, two, or four channel OADM.
C. Three separate OADM modules are available for one, two, and four channels. The wavelengths to be dropped and added are programmable via Cisco Transport Manager (CTM).
D. The ONS 15216 OADM consists only of a single-channel module. Two-channel and four-channel support is available by stacking the single-channel module.
E. The ONS 15216 OADM is available in one, two, four channels. There are 32 single-channel OADM modules, 16 two-channel OADM modules, and 8 four-channel OADM modules.
第4题:
Companycom is about to purchase a POWER5 Enterprise server which requires two Ethernet ports and two disks for each of the four LPARs. It has been configured and validated using the IBM eConfig tool. Which of the following is very important to verify in addition to the eConfig validation?()
第5题:
Your customer has converted from traditional servers to BladeCenter technology and has a requirement for an RSA adapter on a new BladeCenter server. Which of the following options would you use? ()
第6题:
A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()
第7题:
A customer wants to boot from SAN with their IBM BladeCenter infrastructure. What is required for the customer to be able to perform this? ()
第8题:
A network administrator has installed an N7K-F248-25XP module into an existing chassis. The module is powered on, but the interfaces are all in VDC0. What is the reason for this?()
第9题:
A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()
第10题:
When configuring unified ports on a 5548 switch, which port ordering must be respected?()