Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)a

题目

Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system. 空白(4)处填()

  • A、logicalmodels
  • B、physicalmodels
  • C、designmodels
  • D、implementationmodels
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Activities with zero time duration are referred to as:

A.Critical path activites.

B.Noncritical path activities.

C.Slack time activities.

D.Dummies

E.None of above.


正确答案:D
D

第2题:

142 Activities with zero time duration are referred to as:

A. Critical path activites.

B. Noncritical path activities.

C. Slack time activities.

D. Dummies

E. None of above


正确答案:D

第3题:

A project is defined as:

A.a coordinated undertaking of interrelated activities directed toward a specific goal that has a finite period of performance.

B.a large, complex undertaking with many objectives, multiple sources of funding, and a not discernible end point.

C.an undertaking of interrelated activities directed toward a specific goal that can be accomplished in less than one year.

D.a group of activities headed by a project manager who has cradle-to-grave cycle responsibility for the end product.

E.All of the above.


正确答案:A
A

第4题:

Which of the following statement is true?

A. Mark played an active part in community activities.

B. the city councilwoman was responsible for the decrease of life quality.

C. people were encouraged to give advice to solve these city problems.

D. many people were discouraged by the many problems facing them.


正确答案:C

32.答案为C  从第一段People were supposed to suggest solutions to the councilwoman可知政府官员鼓励人们对城市的管理提意见。

第5题:

● Management has decided to "crash" a project in order to avoid penalty payments for late deliveries. To crash the project, either overtime or additional resources should be assigned to:

A All activities.

B Only those activities with the longest time durations.

C Those activities on the critical path begining with the longest time duration activities.

D Those activities with the greatest degree of risk.

E None of the above.


正确答案:C

第6题:

The basic terminology for networks includes:

A.Activities, events, manpower, skill levels and slack.

B.Activities, documentation, events, manpower and skill levels.

C.Slack, activities, events, and time estimates.

D.Time estimates, slack, sponsorship involvement, and activities.

E.Time estimates, slack time, report writing, life cycle phases, and crashing times.


正确答案:C
C

第7题:

● A project is defined as:

A a coordinated undertaking of interrelated activities directed toward a specific goal that has a finite period of performance.

B a large, complex undertaking with many objectives, multiple sources of funding, and a not discernible end point.

C an undertaking of interrelated activities directed toward a specific goal that can be accomplished in less than one year.

D a group of activities headed by a project manager who has cradle-to-grave cycle responsibility for the end product.

E All of the above.


正确答案:A

第8题:

Management has decided to "crash" a project in order to avoid penalty payments for late deliveries. To crash the project, either overtime or additional resources should be assigned to:

A.All activities.

B.Only those activities with the longest time durations.

C.Those activities on the critical path begining with the longest time duration activities.

D.Those activities with the greatest degree of risk.

E.None of the above.


正确答案:C
C

第9题:

The typical example of functional communication activities is ination gap activities.()

此题为判断题(对,错)。


参考答案:正确

第10题:

faced with the new curriculum, english teachers are expected to change in many ways. first ,they are expected to ____________________________.

A. change their views about language which is not a system of linguistic knowledge but a means for communication

B. change their traditional role of a knowledge transmitter to a multi-role educator

C. use more formative assessment in addition to using tests.

D. use more task-based activities and put the students in the centre of learning


正确答案是:A