IBM认证考试

ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical s

题目

ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?()

  • A、Configure the IP address through the first client partition.
  • B、Configure the IP address through the ASMI menus.
  • C、Configure the POWER5 service processor for DHCP from the HMC DHCP server.
  • D、Configure the HMC to use the default IP address on the service processor when acquiring the managed server.
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

  • A、An additional switch for the new HMc  
  • B、Asynchronous adapters on the new HMc
  • C、The two 570 servers are directly connected to the new HMc  
  • D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

正确答案:A

第2题:

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

  • A、An additional switch for the new HMC
  • B、Asynchronous adapters on the new HMC
  • C、The two 570 servers are directly connected to the new HMC
  • D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

正确答案:A

第3题:

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()

A.An additional switch for the new HMC

B.Asynchronous adapters on the new HMC

C.The two 570 servers are directly connected to the new HMC

D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC


参考答案:A

第4题:

A new array of hard drives has been added to an existing server; however, when the server is booted into the Windows OS the new drives fail to appear in My Computer.  From which of the following locations can the new storage drives be added?()

  • A、 Format command
  • B、 Hypervisor
  • C、 Computer Management
  • D、 Disk Management
  • E、 Virtual Center

正确答案:C,D

第5题:

our company has four DNS servers that run windows 2008. Each server has a static ip address. You need to prevent dhcp from assigning the addresses of the DNS servers to DHCP clients. What should you do?()

  • A、Create a new scope for the DNS servers.
  • B、Create a reservation for the DHCP serve.
  • C、Configure the 005 name servers scope option.
  • D、Configure an exclusion that contains the ip addresses of the four DNS servers.

正确答案:D

第6题:

Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()

  • A、Connect to the network,power on the server,Micro-Partition the server
  • B、Connect to the HMC,power on the server,Micro-Partition the server,connect to the network
  • C、Power on server,connect to the network,Micro-Partition the server,connect to the HMC
  • D、Power on the server,connect to the HMC,Micro-Partition the server,connect to the network

正确答案:B

第7题:

A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()

  • A、The room temperature has reached 23C (73.4F). 
  • B、A Blade within the chassis has been shut down. 
  • C、The ambient temperature in the data center has increased 
  • D、One of the additional System X servers in the BladeCenter rack has failed.

正确答案:C

第8题:

A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble.Which resource should be consulted while developing the solution options?()

A. Disk Magic

B. TPC for Data

C. CLARiiON Procedure Generator

D. System Storage Interoperability Center


参考答案:D

第9题:

The current data center has run out of space. A room that is located next to the existing data center is then used to house two racks containing six servers. Six months later, physical housekeeping is performed as part of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?()

  • A、 There are discolored ceiling tiles near the middle of the room.
  • B、 Large amounts of dust have accumulated in the corners of the room.
  • C、 The anti-static carpet has been removed resulting in a bare painted concrete floor.
  • D、 A wet pipe water-based sprinkler system has been installed above the racks.

正确答案:C

第10题:

Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()

  • A、Free up one HMC and update the software for use with the p5 570
  • B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC
  • C、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570
  • D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

正确答案:A