IBM认证考试

On which HMC GUI panel can the ’Enable Electronic Service Agent’ option be found?() A、HMC ManagementB、Systems ManagementC、Service ManagementD、Electronic Management

题目

On which HMC GUI panel can the ’Enable Electronic Service Agent’ option be found?() 

  • A、HMC Management
  • B、Systems Management
  • C、Service Management
  • D、Electronic Management
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which port must be open on the HMC to allow remoteweb access?()

A.22

B.80

C.443

D.8080


参考答案:C

第2题:

A pSeries technical specialist is performing a solutions assurance with a customer for a new single-frame 10-node p655 system being attached to a currently installed HMC.  Which of the following questions should be asked to gather all the required information to determine whether the p655 solution can connect to the HMC?()

  • A、Are there at least ten RS-232 ports available on the HMC?
  • B、Are there at least ten RS-422 ports available on the HMC?
  • C、Are there at least ten RS-232 and two RS-422 ports available on the HMC?
  • D、Are there at least two RS-232 and ten RS-422 ports available on the HMC?

正确答案:C

第3题:

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()

A.An additional switch for the new HMC

B.Asynchronous adapters on the new HMC

C.The two 570 servers are directly connected to the new HMC

D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC


参考答案:A

第4题:

Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()

  • A、An 8-port adapter to the HMC
  • B、A hub for the private network
  • C、An additional Ethernet card to the HMC
  • D、An additional Ethernet card for each partition

正确答案:B

第5题:

Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()

  • A、The resources must be unallocated in an LPAR
  • B、The microcode on the pSeries must be current
  • C、All network adapters on the LPAR must be defined
  • D、Network connectivity and name resolution capability between HMC and LPARs

正确答案:D

第6题:

An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

  • A、An additional switch for the new HMc  
  • B、Asynchronous adapters on the new HMc
  • C、The two 570 servers are directly connected to the new HMc  
  • D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

正确答案:A

第7题:

A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy.  Which of the following statements correctlydescribes the dual HMC environment? ()

  • A、 To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.
  • B、 Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.
  • C、 Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on the
  • D、 Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from

正确答案:C

第8题:

Which tool validates firmware and HMC compatibility for a proposed AIX upgrade?()

A.SPT

B.LVT

C.FLRT

D.SSIC


参考答案:C

第9题:

Which port must be open on the HMC to allow remote web access?() 

  • A、22
  • B、80
  • C、443
  • D、8080

正确答案:C

第10题:

The IP address of POWER6 595 is showing up in the HMC instead of the server name.Next to the IP address is the status,which shows Failed Authentication.The system administrator needs to enter a password.  Which password is needed to restore connection for the POWER6 595 to the HMC?()

  • A、The hscroot user password.
  • B、The CE password.
  • C、The HMC password.
  • D、The ASM admin password.

正确答案:C

更多相关问题