A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()A、Perform 

题目

A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()

  • A、Perform Live Partition Mobility between the two systems.
  • B、Move the boot disks from the old system to the new system.
  • C、Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.
  • D、Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.
如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

An account executive is preparing for an initial one-on-one meeting with a high-level executive who recently read about POWER5 technology.  The account executive needs technical assistance to prepare for the meeting.  How can a pSeries technical specialist best provide assistance in this situation?()

  • A、Create a POWER5 technical presentation for the account executive’s use.
  • B、Mentor the account executive with the most important POWER5 features and benefits.
  • C、Attend the meeting instead of the account executive to present the POWER5 features and benefits.
  • D、Join the meeting via teleconference at a prescheduled time to present the POWER5 features and benefits.

正确答案:B

第2题:

Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()

  • A、POWER5 runs in an SMP mode as default
  • B、POWER5 can run in a full system mode the same as the p690
  • C、POWER5 can run in full system mode with the purchase of PLM
  • D、POWER5 can run in a full system mode, but it is in LPAR mode

正确答案:D

第3题:

A customer has many RS/6000s and POWER4 systems running different AIX applications.  What should the customer do to best position themselves for the migration to POWER5?()

  • A、Upgrade OS to AIX 5.2.
  • B、Implement Micro-Partitioning.
  • C、Upgrade HMC to support POWER5.
  • D、Install Partition Load Manager.

正确答案:A

第4题:

A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()

  • A、 PowerVM Standard Edition on POWER6 hardware
  • B、 PowerVM Standard Edition with POWER5 hardware 
  • C、 PowerVM Enterprise Edition with POWER6 hardware
  • D、 PowerVM Enterprise Edition with POWER5 hardware

正确答案:C

第5题:

A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()

  • A、 vmstat and iostat data from the older machines 
  • B、 The number of CPUs that were installed in the original machines 
  • C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) 
  • D、 Performance data that is collected from the new system after it has been put into production

正确答案:C

第6题:

A customer wants to migrate their existing cluster onto new POWER6 hardware, and in addition requires thecluster to be migrated from PowerHA version 5.3 to 5.5. Given that AIX 6.1 and PowerHA 5.5 filesets arealready installed in the new hardware, which of the following methods would allow the customer to maintaintheir current cluster configuration?()

  • A、Add the new nodes to the existing cluster, and perform a rolling migration and remove the original nodesfrom the cluster
  • B、Add the new nodes to the existing cluster, and perform a non-disruptive upgrade and remove the originalnodes from the cluster.
  • C、Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Start cluster serviceson the new cluster and stop the original cluster
  • D、Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Stop cluster serviceson the original cluster and start on the new cluster

正确答案:D

第7题:

What is a key advantage of the POWER5 technology over all other competitive offerings?()

  • A、POWER5 supports multiple operating systems.
  • B、POWER5 supports more nodes in a clustered environment.
  • C、POWER5 hypervisor has significantly less overhead than hardware partitioning.
  • D、POWER5 has greater granularity of resources such as memory, processors and I/O.

正确答案:D

第8题:

A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()

  • A、 PowerVM Lx86
  • B、 PowerVM Express Edition
  • C、 PowerVM Standard Edition
  • D、 PowerVM Enterprise Edition

正确答案:C

第9题:

A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()

  • A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
  • B、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
  • C、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
  • D、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

正确答案:A

第10题:

Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()

  • A、Include a new HMC in the order to connect to the p5 595
  • B、Include a pair of new HMCs in the order to connect to the p5 595
  • C、Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities
  • D、Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to  POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities

正确答案:B