对
错
第1题:
(PhysiCian's Desk Reference)属于( )。
第2题:
In project management , a (1) is a listing of a project’s milestones, activities, and deliverables, usually with intended start and finish dates. Those items are often estimated in terms of resource (2) ,budget and duration, linked by dependencies and scheduled events.
A.schedule
B.activity
C.plan
D.contractor@@@SXB@@@A.finding
B.balance
C.allocation
D.distribution
第3题:
The(71) is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarized. The workflow enactment service is the heart of a workflow system which consists of several(72). In a workflow system, a process is specified using the process definition tool. Usually, processes are defined in terms of a(73), which consists of(74) indicated using a circle, and(75) shown as a rectangle. These two components can be linked by means of a directed arc.
A.waterfall model
B.workflow reference model
C.evolutionary model
D.spiral model
第4题:
第5题:
第6题:
A.hostname
B.static route
C.virtual router
D.loopback reference
第7题:
If the vessel encountered rough voyage,the captain of the vessel shall ________ his note of protest to harbor authorities after vessel's arrival.
A.typewrite
B.convey
C.submit
D.take down
第8题:
目前设备支持的时钟参考源有两种:『____』和『____』。(The eNB supports two clock reference source:『____』and『____』.)
第9题:
第10题: