单选题A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()A Did you add the redundant AMM?B What i

题目
单选题
A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()
A

Did you add the redundant AMM?

B

What is the processor wattage?

C

Is the AMM firmware up to date?

D

Is the HS22V memory configuration optimized?

参考答案和解析
正确答案: C
解析: 暂无解析
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A PC cannot connect to the network. A network card was purchased without documentation ordriver discs. Which of the following is the BEST way to install it into this machine?()

  • A、Download and install the drivers
  • B、Run Windows update to install drivers
  • C、Copy drivers to flash drive and install
  • D、Purchase the disc online and install

正确答案:C

第2题:

A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports of an HS22 blade server can support if the blade does not have any expansion blades attached?()

  • A、8
  • B、6
  • C、4
  • D、2

正确答案:A

第3题:

A current Sun Solaris customer has just purchased their first p5 590. During the Solution Assurance, the backup requirements were discussed. Which of the following should be recommended to the customer with regards to restoring rootvg?()

  • A、mksysb
  • B、restvg
  • C、AIX install CDs
  • D、Veritas NetBackup

正确答案:A

第4题:

A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports an HS22 blade server can support if the blade does not have any expansion blades attached?()

  • A、8 
  • B、6 
  • C、4 
  • D、2

正确答案:A

第5题:

A customer has purchased an IBM BladeCenter H chassis and needs the following servers:  --Two HS21 blade servers each with 8GB memory and 2 drives   --Two HS21 blade servers each with 24GB memory and 2 drives   --Two LS21 blade servers each with 2GB memory and 2 Hot-Swap SCSI drives   How many total server bays will be required for this configuration?()

  • A、6
  • B、8
  • C、10
  • D、12

正确答案:C

第6题:

A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()

  • A、An IBM BladeCenter H chassis for the JS22 Blade servers
  • B、A concurrent KVM daughter card
  • C、A pair of IBM BladeCenter Power Supplies
  • D、A second Management Module

正确答案:C

第7题:

A customer wants to boot from an iSCSI SAN with their IBM BladeCenter infrastructure running Microsoft Windows Server 2000.  What is required for the customer to be able to perform this?()

  • A、Fibre Channel Expansion Card for each Blade Server
  • B、cKVM Card for each Blade Server
  • C、iSCSI Expansion Card for each Blade Server
  • D、4Gb Modular Flash Drive

正确答案:C

第8题:

A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()

  • A、Did you add the redundant AMM?
  • B、What is the processor wattage?
  • C、Is the AMM firmware up to date?
  • D、Is the HS22V memory configuration optimized?

正确答案:C

第9题:

A customer has a large HP Intel infrastructure and is actively managing these servers with Insight Manager.  They recently purchased an IBM x346 server for a remote office database project.  They do not want to run additional systems management software but require to be notified of PFA and hardware alerting on critical hardware components.  Which of the following solutions would accomplish this?()

  • A、Install an RSA II Slimline card on the IBM server and configure to send email alerts
  • B、Enable the IBM management option in Insight Manager
  • C、Install and configure a Director agent on the IBM server
  • D、Configure the systems management processor on the IBM server

正确答案:A

第10题:

A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()

  • A、The customer used their IBM Customer Number
  • B、The customer has activated their base warranty
  • C、The customer purchased Remote Technical Support Servicepac
  • D、The customer escalated the issue to the Duty Manager

正确答案:C