CMS专题

单选题After purchasing the Active Memory Expansion (AME) Enablement Feature,what tasks must be completed before AME can be used?()A Enable using active partition properties with DLPARB Enter the activation key via the AIX 6.1 command line and reboot AIXC Ent

题目
单选题
After purchasing the Active Memory Expansion (AME) Enablement Feature,what tasks must be completed before AME can be used?()
A

Enable using active partition properties with DLPAR

B

Enter the activation key via the AIX 6.1 command line and reboot AIX

C

Enter the activation key via the HMC,power cycle the managed system and start the LPAR

D

Enter the activation key via the HMC,modify the partition profile and restart the LPAR

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which of these is a correct description of SSO?()

  • A、 It will only become active after a software failure.
  • B、 It will only become active after a hardware failure.
  • C、 It requires that Cisco NSF be enabled in order to work successfully.
  • D、 It synchronizes the MAC·, FIB·, and adjacency tables between Active and Standby RouteProcessors.

正确答案:D

第2题:

What operating system is required to support Active Memory Expansion?()

  • A、AIX 6.1
  • B、AIX 5.3
  • C、Red Hat 10
  • D、SUSE LINUX 11

正确答案:A

第3题:

At which of the following times should the administrator refer to the HCL?()

A. Prior to purchasing hardware

B. Before installation

C. When installing drivers

D. After installation


参考答案:A

第4题:

Memory utilization by the print spooler process is constantly climbing after users begin to print to acertain type of printer.  Which of the following is the MOST likely cause of the problem?()

  • A、 Corrupted print spooler software
  • B、 Memory leak in one of the print drivers
  • C、 The disk drive is out of free space
  • D、 Memory leak in the print spooler

正确答案:B

第5题:

A technician(技术) has a current baseline(基准线) and is told to install additional(添加) memory and a faster NIC card.  At which point in time should the next baseline be run?()

  • A、 After the memory is installed
  • B、 Before the upgrade is performed
  • C、 After the NIC is installed
  • D、 After the upgrades are performed

正确答案:D

第6题:

The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1.  They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server.   How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()

  • A、Run amepat now on all of the existing LPARs.
  • B、Run amepat after consolidation on all LPARs.
  • C、Run amepat now on all existing LPARs running on the POWER6 servers.
  • D、Run amepat now on all existing LPARs running database applications.

正确答案:A

第7题:

Which of these is a correct description of Stateful Switchover?()

  • A、 It will only become active after a software failure
  • B、 It will only become active after a hardware failure
  • C、 It requires that Cisco N3F· be enabled in order to work successfully
  • D、 It synchronizes the MAC·, FIB·, and adjacency tables between Active and Standby Route Processors

正确答案:D

第8题:

Which of these is a correct description of SSO?()

  • A、It will only become active after a software failure.
  • B、It will only become active after a hardware failure.
  • C、It requires that Cisco NSF be enabled in order to work successfully.
  • D、It synchronizes the MAC, FIB, and adjacency tables between Active and Standby Route Processors.

正确答案:D

第9题:

At which of the following times should the administrator refer to the HCL?()

  • A、Prior to purchasing hardware
  • B、Before installation
  • C、When installing drivers
  • D、After installation

正确答案:A

第10题:

A server needs to have memory added to support a new application. It currently is using PC4200 in a single channel configuration. Which of the following would be the correct memory upgrade?()

  • A、Install larger capacity PC2100 dual channel memory modules.
  • B、Add a PCI expansion card with PC2100 single channel memory modules.
  • C、Install smaller capacity PC4200 single channel memory modules.
  • D、Install larger capacity PC4200 single channel memory modules.

正确答案:D