单选题Which includes an activity to host a workshop that focuses on the identification and configuration of the actual network components (routers, servers, local-area network or LAN, and so on) that will be incorporated to run and support the Cisco Unified 

题目
单选题
Which includes an activity to host a workshop that focuses on the identification and configuration of the actual network components (routers, servers, local-area network or LAN, and so on) that will be incorporated to run and support the Cisco Unified Communications system()
A

Implement

B

Design

C

Plan

D

Prepare

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

● Project Time Management includes the processes required to manage timely completion of the project, these processes interact with each other. (74) is following the process- Estimate Activity Durations.

(74)

A.Develop Schedule

B.Estimate Activity Resources

C.Define Activities

D.Sequence Activities


正确答案:A
试题(74)分析
    项目进度管理包含多个项目实效管理过程,这些过程相互影响,其中紧接活动历时估算的过程是答案A计划编制。
参考答案
    (74)A

第2题:

is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships:(67), the initiation of the successor activity, depends upon the completion of the predecessor activity.(68), the initiation of the successor activity, depends upon the initiation of the predecessor activity.

A.PDM

B.CPM

C.PERT

D.AOA


正确答案:A
解析:PDM是以一种方块或矩形(或称为节点)来表示活动,并将它们用表示依存关系的箭线连接起来,以构建项目进度网络图的方法。这种方法包括了下列依存或前导关系:完成—开始(F-S),后续活动的开始依赖于前置活动的完成。开始-开始(S-S),后续活动的开始依赖于前置活动的启动。

第3题:

PDM includes four types of dependencies or precedence relationships:().The completion ofthe successor activity depends upon the initiation of the predecessor activity.

A.Finish-to-Start

B.Finish-to-Finish

C.Start-to-Start

D.Start-to-Finish


参考答案:D

该题的关键词为"PDM includes four types",其语句结构为"The completion of the successor activity(主语)depends upon(谓语)the initiation of the predecessor activity",含义为"后续活动的完成依赖于前置活动的开始",根据选项容易识别为SF活动依赖类型。

第4题:

Every host and router on the Internet has an IP address, which encodes its(12).

A.host number

B.network number

C.host number and socket

D.host number and network number


正确答案:D

第5题:

Every host and router on the Internet has an IP address, which encodes its

A.host number

B.host number and socket

C.network number

D.host number and network number


正确答案:D

第6题:

Project Time Management includes the processes required to manage timely completion of the project, these processes interact with each other.______is following the process-Estimate Activity Durations.

A.Develop Schedule

B.Estimate Activity Resources

C.Define Activities

D.Sequence Activities


正确答案:A
解析:项目进度管理包含多个项目实效管理过程,这些过程相互影响,其中紧接活动历时估算的过程是答案A计划编制。

第7题:

PDM includes four types of dependencies or precedence relationships.( ),the initiation of the successor activity,depends upon the initiation ofthe predecessor activity. A.Start-to-Start B.Finish-to-Finish C.Start-to-Finish D.Finish-to—Start


正确答案:A
前导图法包括四种活动依赖或前导关系。开始——开始(S-S),后续活动的开始依赖于前置活动的启动。

第8题:

PDM includes four types of dependencies or precedence relationships: (). The completion of the successor activity depends upon the initiation of the predecessor activity.

A.Finish-to-Start

B.Finish-to-Finish

C.Start-to-Start

D.Start-to-Finish


参考答案:B

第9题:

Linguistic interaction is a collaborative activity involving the establishment of a triangular relationship, it includes __________.

A.the relation between the participants

B.the tone of speech

C.the context of situation

D.whether the communication is in speech or writing


正确答案:ACD

第10题:

Computer systems consist of two very different types of elements: Hardware, which includes all the physical things that can be touched and(71)which tells the hardware how to do.

A.Operating system

B.I/O devices

C.Courseware

D.Software


正确答案:D
解析:计算机系统由两种完全不同类型的部分组成:硬件(我们能触摸到的所有物体)和软件(告诉硬件怎样做)。