第1题:
Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems?()
第2题:
A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()
第3题:
A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications. Each partition requires two of the following: OS boot drives, fiber adapters, and gigabit Ethernet adapters. The customer has an HMC with an available serial port. In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()
第4题:
A customer has systems with AIX 6.1 and 5.3 distributed across two data centers located 8km apart. They want to implement high availability with automated application restart and synchronous data replication between the IBM Systems Storage DS8700 systems which are installed in each datacenter. Which solution addresses the customer requirements?()
第5题:
A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility. Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()
第6题:
A customer recently acquired two Power servers and plans to implement AIX 6.1 and Live Application Mobility. What other product is required to accomplish this objective? ()
第7题:
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()
第8题:
What does the "allow performance information collection" button do in the Hardware Management Console (HMC) GUI? ()
第9题:
A customer has a new Power 720 with PowerVM Standard Edition. They plan to migrate their single-partition POWER5 550 to the new Power 720. How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()
第10题:
Which of the following is a feature of Integrated Virtualization Manager (IVM)? ()