单选题Which of the following ensures that air is passed through a server chassis correctly?()A U-size templatesB Phase changersC BafflesD Molex connectors

题目
单选题
Which of the following ensures that air is passed through a server chassis correctly?()
A

U-size templates

B

Phase changers

C

Baffles

D

Molex connectors

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which of the following ensures that air is passed through a server chassis correctly?()

A. U-size templates

B. Phase changers

C. Baffles

D. Molex connectors


参考答案:A

第2题:

Which one of the following is not relevant to the others?()

  • A、airport
  • B、airfield
  • C、airline
  • D、air-conditioned

正确答案:D

第3题:

Hepatitis A can be contracted through the following routes except ( ) .

A、water

B、stool

C、food

D、air


参考答案:D

第4题:

Which of the following ensures that air is passed through a server chassis correctly?()

  • A、U-size templates
  • B、Phase changers
  • C、Baffles
  • D、Molex connectors

正确答案:A

第5题:

After a server has been installed into a rack, an administrator must ensure which of the following?()

  • A、Warm air flow is permitted through the front bezel
  • B、The system is labeled so that it can be identified
  • C、Verify the change control process can be implemented
  • D、Determine the correct power requirements

正确答案:B

第6题:

After a server has been installed into a rack, an administrator must ensure which of the following?()

A. Warm air flow is permitted through the front bezel

B. The system is labeled so that it can be identified

C. Verify the change control process can be implemented

D. Determine the correct power requirements


参考答案:B

第7题:

Which of the following allows a program or port through a software firewall?()

  • A、Exception
  • B、Pass-through
  • C、Port-forwarding
  • D、Punch-through

正确答案:A

第8题:

In an operating diesel engine, which of the following conditions is an indication of a leaking air starting valve?

A.Noise coming from that air starting valve

B.Continuous operation of the starting air compressor

C.Zero air pressure in the air starting system

D.Overheated starting air pipe to the cylinder head


正确答案:D

第9题:

Which of the following channels air flow through a server chassis?()

  • A、Fans
  • B、Ducts
  • C、Heat sinks
  • D、Condensers

正确答案:B

第10题:

Which of the following components channels air flow through a server chassis?()

  • A、 Fan
  • B、 Heat sink
  • C、 Shroud
  • D、 Radiator

正确答案:C