U-size templates
Phase changers
Baffles
Molex connectors
第1题:
A. U-size templates
B. Phase changers
C. Baffles
D. Molex connectors
第2题:
Which one of the following is not relevant to the others?()
第3题:
A、water
B、stool
C、food
D、air
第4题:
Which of the following ensures that air is passed through a server chassis correctly?()
第5题:
After a server has been installed into a rack, an administrator must ensure which of the following?()
第6题:
A. Warm air flow is permitted through the front bezel
B. The system is labeled so that it can be identified
C. Verify the change control process can be implemented
D. Determine the correct power requirements
第7题:
Which of the following allows a program or port through a software firewall?()
第8题:
In an operating diesel engine, which of the following conditions is an indication of a leaking air starting valve?
A.Noise coming from that air starting valve
B.Continuous operation of the starting air compressor
C.Zero air pressure in the air starting system
D.Overheated starting air pipe to the cylinder head
第9题:
Which of the following channels air flow through a server chassis?()
第10题:
Which of the following components channels air flow through a server chassis?()