单选题A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future.  Which pSeries system would be positioned best to m

题目
单选题
A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future.  Which pSeries system would be positioned best to meet this customer’s requirements?()
A

p5-550 with the Advanced POWER Virtualization feature and AIX 5.2

B

p5-550 with the POWER5 processor technology and AIX 5.2

C

p5-570 with the Advanced POWER Virtualization feature and AIX 5.3

D

p5-570 with the POWER5 processor technology and AIX 5.2

参考答案和解析
正确答案: A
解析: 暂无解析
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()

  • A、e-Config
  • B、System Planning Tool (SPT)
  • C、IBM Workload Estimator (WLE)
  • D、IBM Performance Monitor (PM)

正确答案:B

第2题:

A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()

  • A、Create a system profile for each partition. Assign all needed resources as 'required'.
  • B、Define all system resources as 'desired' on the Testing partition. Activate only as needed.
  • C、Create two shared processor pools. Assign the minimal I/O resources required for each partition to the shared pools.
  • D、Create both partitions with minimal 'required' resources, and optional resources as 'desired'. Activate each partition as necessary.

正确答案:D

第3题:

A small organization is purchasing a POWER5 to consolidate four applications. Currently, each application has two Host Bus Adapters (HBA) connected to an Enterprise Storage Server (ESS). The customer is concerned about the cost of purchasing eight new HBAs. Which feature of virtualization will be most beneficial to this organization?()

  • A、Virtual Ethernet
  • B、Micro-Partitioning
  • C、Virtual I/O Server
  • D、Capped and uncapped partitions

正确答案:C

第4题:

A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention. Which of the following meets the customer requirement?()

  • A、Define the production partitions' maximum CPU to the licensing limitations.  Define the development/test partition maximums to one core. Configure each partition to be capped.
  • B、Define the production partitions' maximum CPU to the licensing limitations.  Define the development/test partition maximums to one core. Configure each partition to be uncapped.
  • C、Define the production partitions' maximum CPU to the licensing limitations.  Define the development/test partitions to use no more than one core. Configure the HMC scheduler to  dynamically assign processors among the pools over a day.
  • D、Create a shared processor pool for each production partition, with the maximum processor limit set to the  licensing limit for the application in the pool. Assign the development and testing partitions to a processor  pool with a maximum of 1 core. Configure each partition to use uncapped processing.

正确答案:D

第5题:

A customer needs a new database server.  The database application has a high memory overhead but does not benefit from 8-way processing.  They would like a rack mountable system, which will support four Xeon processors with 512KB of L2 cache and 16GB of main system memory.  Which of the following will satisfy the customer’s requirements?()

  • A、x445 with four Xeon DP processors and 16GB of memory in a single SMP module
  • B、x445 with four Xeon MP processors and 16GB of memory in a single SMP module
  • C、x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory
  • D、x445 with two SMP modules each containing two Xeon MP processors and 8GB of memory

正确答案:C

第6题:

A customer needs a new Microsoft Windows 2003 Server.  They are running an application that requires substantial memory.  They would like a rack mountable system, which will support four Xeon processors with 2MB of L3 cache.  Which of the following is the minimum configuration to satisfy the customer’s requirements?()

  • A、x445 with four Xeon MP processors and 8GB of memory
  • B、x445 with four Xeon MP processors and 16GB of memory in a single SMP module
  • C、x445 with four Xeon DP processors and 16GB of memory in a single SMP module
  • D、x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory

正确答案:A

第7题:

A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future.  Which pSeries system would be positioned best to meet this customer’s requirements?()

  • A、p5-550 with the Advanced POWER Virtualization feature and AIX 5.2
  • B、p5-550 with the POWER5 processor technology and AIX 5.2
  • C、p5-570 with the Advanced POWER Virtualization feature and AIX 5.3
  • D、p5-570 with the POWER5 processor technology and AIX 5.2

正确答案:D

第8题:

Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()

  • A、Create all the partitions as AIX 5.2, each having two dedicated processors.
  • B、Purchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.
  • C、Specify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.
  • D、Use the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.

正确答案:C

第9题:

A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the 64 active cores, and will use it in multiple partitions.   How can the customer ensure that the number of licenses purchased for DB2 is not exceeded?()

  • A、Create a 32-core shared processor pool for the DB2 partitions.
  • B、Limit the number of virtual processors on each DB2 partition to 32.
  • C、Use the IBM License Metric Tool to dynamically manage DB2 usage in the partitions.
  • D、Set the ‘Desired Processing Units’ in each DB2 partition profile so that the sum of all partitions equals 32.

正确答案:A

第10题:

A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()

  • A、Direct the customer to the Installation Guide for each system to identify the power requirements.
  • B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
  • C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
  • D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.

正确答案:C