PowerVM Standard Edition
VMControl Standard Edition
Hardware Management Console
IBM Systems Director Standard Edition
第1题:
The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1. They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server. How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()
第2题:
An administrator is attempting to recover from a power failure in the data center. Which of the following is the BEST way to recover the servers?()
第3题:
Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()
第4题:
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()
第5题:
Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?()
第6题:
Multiple users are trying to telnet to the AIX server. They are able to ping the server successfully, but are getting the following error message: telnet: connect: A remote host refused an attempted connect operation Which of the following could be the cause of this problem?()
第7题:
An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()
第8题:
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()
第9题:
A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()
第10题:
Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions. Which of the following data center servers can be used for this purpose?()