CMS专题

单选题A customer has six Windows 2003 servers, three RedHat Linux servers, and three Netware servers.  The current environment is direct attached storage.  The customer needs a 2Gb Fibre solution that can scale up to 64 partitions over the next three years a

题目
单选题
A customer has six Windows 2003 servers, three RedHat Linux servers, and three Netware servers.  The current environment is direct attached storage.  The customer needs a 2Gb Fibre solution that can scale up to 64 partitions over the next three years and provide connectivity to all three platforms.  The customer also needs a fibre attached backup solution.  Which of the following solutions has the best combination of price and performance?()
A

A DS4300 Turbo with Fibre Attached Tape Library

B

A DS4500 with EXP700’s and Fibre Attached Tape Library

C

A DS4500 with EXP710’s and Fibre Attached Tape Library

D

A DS4300 with Additional EXP710’s and a SCSI Attached Tape Library

参考答案和解析
正确答案: B
解析: 暂无解析
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()

  • A、 PowerVM Lx86
  • B、 PowerVM Express Edition
  • C、 PowerVM Standard Edition
  • D、 PowerVM Enterprise Edition

正确答案:C

第2题:

A customer plans to install ten Microsoft Windows servers, three Linux servers, and five AIX servers, with two Fibre Channel host bus adapters each as part of an IBM DS8700 implementation. What multipathing driver is required to build a redundant solution?()

  • A、RDAC
  • B、MPIO
  • C、SSPC
  • D、SDDPCM

正确答案:B

第3题:

A customer plans to install ten Microsoft Windows servers, three Linux servers, and five AIX servers, with two Fibre Channel host bus adapters each as part of an IBM DS8700 implementation.What multipathing driver is required to build a redundant solution?()

A.RDAC

B.MPIO

C.SSPC

D.SDDPCM


参考答案:B

第4题:

A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700.  They would like to upgrade and plan for 40 TB capacity.  The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()

  • A、What are the plans for Disaster Recovery? 
  • B、What are the plans for data migration? 
  • C、Would iSCSI meet your needs? 
  • D、How much space is available in the current storage systems?

正确答案:B

第5题:

A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()

  • A、An IBM BladeCenter H chassis for the JS22 Blade servers
  • B、A concurrent KVM daughter card
  • C、A pair of IBM BladeCenter Power Supplies
  • D、A second Management Module

正确答案:C

第6题:

One of your customer has six sites, three of which process a large amount of traffic among them.He plans to grow the number of sites in the future. Which is the most appropriate design topology?()

  • A、 full mesh
  • B、 peer-to-peer
  • C、 partial mesh
  • D、 hub and spoke

正确答案:C

第7题:

A financial industry customer will consolidate their Intel-based servers to a p5-550 running AIX, and needs experienced technical services.  What information should the account executive provide to the customer to assure them that the technical specialist has the required experience?()

  • A、The technical specialist has supported multiple Cluster 1350 environments. References will be provided.
  • B、The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.
  • C、The technical specialist has worked on multiple UNIX consolidation projects.  References will be provided.
  • D、The technical specialist has worked on Linux consolidation efforts.  References will be provided.

正确答案:C

第8题:

下列哪项不是Microsoft公司的操作系统()

  • A、Window 98
  • B、DOS
  • C、Windows NT
  • D、RedHat Linux

正确答案:D

第9题:

A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()

  • A、Ensure Director Agent is installed on the new servers.
  • B、Ensure a DHCP Sever is installed and configured in the environment.
  • C、Ensure Server Plus Pack option has been installed and configured.
  • D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.
  • E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.

正确答案:B,E

第10题:

A customer has a mixed Dell and IBM server environment.  They want to implement a system management solution for all their Windows, Linux, and VMWare ESX Intel based servers.  Which TWO features of IBM Director will be an advantage for this customer?()

  • A、IBM Director comes with free Aurema and SteelEye software plug-ins.
  • B、IBM Director supports non-IBM industry standard Intel based servers.
  • C、IBM Director servers can be managed from within the MS Performance Monitor.
  • D、IBM Director requires no agents to be installed and run on the IBM systems.
  • E、IBM Director offers agents to manage VMWare ESX Server and runs on Linux while Dell does not.

正确答案:B,E

更多相关问题