海船船员考试

单选题Deviation changes with a change in().A latitudeB headingC longitudeD sea conditions

题目
单选题
Deviation changes with a change in().
A

latitude

B

heading

C

longitude

D

sea conditions

参考答案和解析
正确答案: D
解析: 暂无解析
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

33 The purpose of configuration management is to:

A. insure drawings are updated

B. control change throughout the project

C. control change during the production only

D. generate engineering change proposals

E. inform. the project manager of changes


正确答案:B

第2题:

● During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised (75)are necessary.

(75)

A. proceedings

B. controls

C. forecasting’s

D. prelibations


正确答案:B

第3题:

The purpose of configuration management is to:

A.insure drawings are updated

B.control change throughout the project

C.control change during the production only

D.generate engineering change proposals

E.inform. the project manager of changes


正确答案:B
B

第4题:

Deviation changes with a change in ______.

A.latitude

B.heading

C.longitude

D.sea conditions


正确答案:B

第5题:

When making changes to a server, which of the following is the BEST way to troubleshoot a problem?()

A. Perform root cause analysis and then test the theory to determine the cause.

B. Make changes to the system and document everything once the problem is resolved.

C. Make multiple changes to all affected areas to resolve all potential issues.

D. Make a change and if the problem is not resolved, reverse the change.


参考答案:D

第6题:

● The purpose of configuration management is to:

A insure drawings are updated

B control change throughout the project

C control change during the production only

D generate engineering change proposals

E inform. the project manager of changes


正确答案:B

第7题:

● Changes may be requested by any stakeholder involved with the project, but changes can be authorized only by (73).

(73)

A.executive IT manager

B.project manger

C.change control board

D.project sponsor


正确答案:C
试题(73)分析
 项目变更可以由IT经理executive IT manager、项目管理者project manager、项目发起人project sponsor等任意项目干系人发起,但只有变更控制委员会change control board授权通过,所以选C。
参考答案
(73)C

第8题:

During project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. The baseline schedule:

A.Now becomes the new schedule, including the changes, and the original baseline is disregarded.

B.Is still the original baseline but annotated to reflect that a change has taken place.

C.Is amended to reflect the scope change, but the original baseline is still maintained for post-project review.

D.Is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)

E.Is the same since baseline schedules cannot change once the development phase is completed.


正确答案:C

 

第9题:

During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised(75)are necessary.

A.proceedings

B.controls

C.forecasting's

D.prelibations


正确答案:B
解析:在一个项目的生命期内,有多种原因可以引起对需求的变更。当需要发生变更而工作正在进行时,可导致新的需求产生并迫使现有的需求发生变更。需要快速而有效地管理这些新的需求和新的变更。为了有效地分析这些变更的影响,必须确定每一个需求源,并记录变更的基本过程。无论如何,项目经理希望能追踪有关需求稳定性的、恰当的措施,以判断是否需要新的或修正的控制措施。

第10题:

Heeling error is defined as the change of deviation for a heel of ______.

A.2° while the vessel is on an intercardinal heading

B.1° while the vessel is on a compass heading of 000°

C.2° and is constant on all headings

D.1° while the vessel is on a compass heading of 180°


正确答案:B

更多相关问题