after every major hydrographic survey of the area covered by the chart
when there are numerous corrections to be made or the corrections are extensive
when a low-stock situation occurs and minor corrections are made
every two years to update the magnetic variation information
第1题:
These sessions are designed to ________ better working relationships.
A foster
B enact
C revise
D implement
第2题:
During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised(75)are necessary.
A.proceedings
B.controls
C.forecasting's
D.prelibations
第3题:
To determine what causes the majority of quality problems in a process, a very useful tool is the:
A . cause and effect diagrams.
B . flow chart.
C . control chart.
D . pareto chart.
E . trend chart.
第4题:
When navigating in high latitudes and using a chart based on a Lambert conformal projection,______.
A.a straight line drawn on the chart approximates a great circle
B.the chart should not be used outside of the standard parallels
C.the course angle is measured at the mid-longitude of the track line
D.distance cannot be measured directly from the chart
第5题:
A revised print of a chart is made ______.
A.after every major hydrographic survey of the area covered by the chart
B.when there are numerous corrections to be made or the corrections are extensive
C.when a low-stock situation occurs and minor corrections are made
D.every two years to update the magnetic variation information
第6题:
In order to limit the introduction of alien species by ship, ____was adopted on 13 Feb, 2004 at the IMO.
A.Revised MARPOL annex I
B.Revised MARPOL annex II
C.International convention for the control and management of ships' ballast water and sediments
D.ISPS Code
第7题:
A.chart 1的 additional info
B.chart 1的 event
C.chart 1的 change ms
D.chart 1的Information Elements
第8题:
153 To determine what causes the majority of quality problems in a process, a very useful tool is the: A. cause and effect diagrams.
B. flow chart.
C. control chart.
D. pareto chart.
E. trend chart
第9题:
The revision date of a chart is printed on which area of the chart?
A.Top center
B.Lower-left corner
C.Part of the chart title
D.Any clear area around the neat line
第10题:
A chart has extensive corrections to be made to it. When these are made and the chart is again printed,the chart issue is a ______.
A.first edition
B.new edition
C.revised edition
D.reprint