海船船员考试

单选题The most accurate method of determining gyrocompass error while underway is by().A Comparing the gyro azimuth of a celestial body with the computed azimuth of the bodyB Comparing the gyro heading with the magnetic compass headingC Determining from the

题目
单选题
The most accurate method of determining gyrocompass error while underway is by().
A

Comparing the gyro azimuth of a celestial body with the computed azimuth of the body

B

Comparing the gyro heading with the magnetic compass heading

C

Determining from the chart the course made good between celestial fixes

D

It cannot be determined accurately at sea due to drift of unknown currents

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

173 The most precise or accurate estimate for determining project costs is the _____ estimate. A. Definitive.

B. Analogy

C. Budget

D. Modified standards.

E. Rule of thumb


正确答案:A

第2题:

● The critical path is calculated by

A subtracting the end date of task one from the start date of task two.

B determining which tasks have the least amount of total slack.

C totaling the time for all activities.

D determining the shortest path through the network.

E Determining which tasks have the most slack


正确答案:B

第3题:

The critical path is calculated by

A.subtracting the end date of task one from the start date of task two.

B.determining which tasks have the least amount of total slack.

C.totaling the time for all activities.

D.determining the shortest path through the network.

E.Determining which tasks have the most slack


正确答案:B
B

第4题:

three ways of presenting grammar are most frequently used and discussed; they are the deductive method, the inductive method and _________________.

A、the discovery method

B、the cognitive method

C、the guided method

D、the guided discovery method


参考答案:D

第5题:

three ways of presenting grammar are most frequently used and discussed; they are the deductive method, the inductive method and ______________.

A. the guided discovery method

B. the cognitive method

C. the discovery method

D. the guided method


正确答案是:A

第6题:

● A work breakdown structure is most useful for:

A identifying individual tasks for a project

B scheduling the start of tasks

C developing a cost estimate

D determining potential delays

E A and C


正确答案:E

第7题:

●The error messages given by a C compiler show the message text,the most common cause of the error,and a suggestion for (73) the error.

(73) A.upfsying

B.fixing

C.changing

D.Editing


正确答案:B
【解析】译文:C编程器给出的错误信息说明了改错误最常见的原因以及纠正方法。

第8题:

The most precise or accurate estimate for determining project costs is the _____ estimate.

A . Definitive.

B . Analogy

C . Budget

D . Modified standards.

E . Rule of thumb.


正确答案:A

第9题:

The error messages given by a C compiler show the message text,the most common(68) of the error,and a suggestion for fixing the error.

A.consequence

B.cause

C.information

D.result


正确答案:B
解析:C编译器给出的错误信息包括信息文本、最常见的错误原因和一个纠正错误的建议。

第10题:

The most accurate account of cargo on board will be found in the ______.

A.Manifest

B.charter party

C.Bill of Lading

D.Portage Bill


正确答案:C