the provision to be provided when the vessel sails in fresh water area
the fresh water to be carried by a vessel
the allowance of fresh water for each crew member when in distress at sea
the amount of free board decreased when sailing in fresh water area
第1题:
Prior to getting underway in fresh or brackish water,the Master must ______.
A.log the density of the water
B.secure all overboard discharges
C.take on fresh water ballast
D.clean the sides with fresh water
第2题:
You are loading in the winter in Albany,N.Y.,for a voyage to a port governed by the tropical load line mark. Which of the following statements is TRUE? (Hydrometer reading in Albany is 1.000)
A.You may not exceed the winter load line mark when you finish loading except for the burnout to sea
B.You may calculate the burnout necessary to reach the tropical zone and load extra cargo to compensate
C.The freshwater allowance and burnout to sea may be subtracted from the required freeboard in Albany
D.You may load to the winter mark less the fresh water allowance if you will be at the tropical mark upon arrival in the tropical zone
第3题:
B
The world is not only hungry,it is also thirsty for water. this may seem strange to you,since nearly 75% of the earth is covered with water. But about 97% of this water is sea water.Man can only drink and use the other 3% fresh water that comes from rivers,lakes,under-ground and other places. And we cannot even use all of that,because some of this fresh water has been made dirty.
At the moment,this small amount(数量) of fresh water is still enough for us. However,our need for water is getting greater and greater. Only if we take steps to solve this problem now,we can get away from a serious world water shortage later on. The people of the world cannot have an enjoyable life without enough clean water.
On one hand we should stop wasting this little water of ours,on the other hand we should find ways to reuse it,but this has not been done widely.
Today,in most large cities,water is used only once and it then returns to the sea or runs into underground places.lf we can make it clean again,it can be used once more just as if it were fresh from a spring.
But even if large cities reuse its water,we still would not have enough in the future. Where.could we turn to next for water? To the ocean! How can we do to make use of this great a-mount of sea water? We can take the salt from the water to make it fresh.
So if we take all these steps,we'll be in no danger of drying up!
( )26. Why does the writer say that the world is thirsty for water?
A. The amount of fresh water is really very small.
B. The people of the world waste too much water.
C. The people of the world have to drink a lot of water every day.
D. There are too many people in the world needing water.
第4题:
淡水注入管()
第5题:
______is the number of millimeters by which the mean draft changes when a ship passes from salt water to fresh water,or vice versa,whilst floating at the loaded draft.
A.TPC
B.The Fresh Water Allowance
C.Parallel sinking of the ship
D.UKC
第6题:
When is the density of the water required to be logged in the logbook of a ship?
A.Any time the vessel moves from water of one density into waters of a different density
B.Prior to getting underway when the vessel is floating in fresh or brackish water
C.Only when the vessel moves from fresh water into salt water
D.The density of the water is not required to be logged in the unofficial logbook
第7题:
Topside area from deep loadline to bulwark to be thoroughly washed down with ______.
A.highly pressure fresh water
B.high pressured fresh water
C.highly pressured fresh water
D.high pressure fresh water
第8题:
Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in ______.
A.INTERNATIONAL LOADLINE CERTIFICATE
B.PASSENGER SHIP SAFETY CERTIFICATE
C.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATE
D.GENERAL DECLARATION
第9题:
水泥涂料用于淡水舱和双层底舱。()
第10题:
饮用水注入管()