海船船员考试

单选题The SMS should provide for specific measures aimed at promoting the () of equipment or systems the sudden operational failure of which may result in hazardous situations.A visibilityB abilityC reliabilityD capability

题目
单选题
The SMS should provide for specific measures aimed at promoting the () of equipment or systems the sudden operational failure of which may result in hazardous situations.
A

visibility

B

ability

C

reliability

D

capability

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Strict measures ________to keep them away form. fire

A.should be taken

B.should take

C.be taken

D.should been taken


正确答案:A

第2题:

We should not talk about other people’s ______ life.

A、private

B、individual

C、own

D、specific


参考答案:A

第3题:

it is time that measures _________ to prevent such events.

A. taken

B.are taken

C. were taken

D. should be taken


正确答案:C

第4题:

Project Quality Management must address the management of the project and the()ofthe project. While Project Quality Management applies to all projects,regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.

  • A、performance
  • B、process
  • C、product
  • D、object

正确答案:C

第5题:

We should think long term and take____measures.

A.primitive
B.productive
C.permissive
D.proactive

答案:D
解析:
A选项意为“原始的”;B选项意为“生产的、富有成效的”;C选项意为“自由的、宽容的”;D选项意为“前瞻性的、积极主动的”。题目意为“我们应该从长远考虑,采取____的措施。”因此选D,采取前瞻性的措施。
  

第6题:

(b) Discuss the relevance of each of the following actions as steps in trying to remedy performance measurement

problems relating to the ‘365 Sports Complex’ and suggest examples of specific problem classifications that

may be reduced or eliminated by each action:

(i) Focusing on and improving the measurement of customer satisfaction

(ii) Involving staff at all levels in the development and implementation of performance measures

(iii) Being flexible in the extent to which formal performance measures are relied on

(iv) Giving consideration to the auditing of the performance measurement system. (8 marks)


正确答案:
(b) Trying to focus on and improve the measurement of customer satisfaction.
This is a vital goal. Without monitoring and improvement of levels of customer satisfaction, an organisation will tend to
underachieve and is likely to have problems with its future effectiveness. Positive signals from performance measures made
earlier in the value chain are only relevant if they contribute to the ultimate requirement of customer satisfaction. Tunnel vision
and sub-optimisation are examples of measurement problems that may be reduced through recognition of the need for a
management focus on customer satisfaction. For example undue focus on the importance of maximising opening hours may
lead to lack of focus on other quality issues seen as important by customers.
Involving staff at all levels in the development and implementation of performance measures.
People are involved in the achievement of performance measures at all levels and in all aspects of an organisation. It is
important that all staff are willing to accept and work towards any performance measures that are developed to monitor their
part in the operation of the organisation and in the achievement of its objectives. This should help, for example, to reduce
gaming. At the sports complex an example of gaming might be, a deliberate attempt to understate the potential benefits of
maintaining the buildings in order to ensure that funds would be used for other purposes such as an increased advertising
budget. The directors of Astrodome Sports Ltd must recognise that leisure facilities that appear dated and in a poor state of
repair will cause customers to look for more aesthetically appealing alternatives.
Being flexible in the extent to which formal performance measures are relied on.
It is best to acknowledge that measures should not be relied on exclusively for control. A performance measure may give a
short-term signal that does not relate directly to actions that are taking place to improve the level of performance in the longer
term. To some extent, improved performance may be achieved through the informal interaction between individuals and
groups. This flexibility should help to reduce measure fixation and misrepresentation. For example the percentage increase in
the quantity of bowling equipment purchased is seen as necessarily implying increased demand for use of the bowling greens.
Giving consideration to the audit of the performance measurement system.
Actions that may be taken may include:
– Seeking expert interpretation of the performance measures in place. It is important that any audit is ‘free from bias’ and
conducted independently on an ‘arm’s length’ basis. Thus it is essential that such audits should be ‘free from the
influence’ of those personnel involved in the operation of the system.
– Maintaining a careful audit of the data used. Any assessment scheme is only as good as the data on which it is founded
and how this data is analysed and interpreted.
The above actions should help, in particular, to reduce the incidence and impact of measure fixation, misinterpretation and
gaming.
For example, an audit may show that the directors of Astrodome Sports Ltd are fixated on equipment availability and
misinterpret this as being the key to customer volume and high profitability. The audit may also provide evidence of gaming
such as a deliberate attempt to underplay the benefits of one course of action in order to release funds for use on some
alternative.

第7题:

What measures should be taken if anchor dragging?


正确答案:Anchor dragging means the anchor can’t bring up the ship to the seabed/ground. To prevent anchor dragging, you should make full consideration of all the features of the anchor position before anchoring, work out the cable length, and make sure the ship is brought up when anchoring. When anchor dragging, we should inform the master, the engine room, c/o and other personnel involved. Announce the alarm on radio to the other ships in vicinity. And then heave up the anchor to drop it again.

第8题:

The talks _______ ending the nine year old war in Mozambique.

A. aimed to

B. aimed for

C. aimed on

D. aimed at


参考答案:D

第9题:

The user SCOTT who is the owner of ORDERS and ORDERJTEMS tables issues the following  GRANT command:  GRANT ALL   ON orders, order_items   TO PUBLIC;   What correction needs to be done to the above statement? ()

  • A、 PUBLIC should be replaced with specific usernames.
  • B、 ALL should be replaced with a list of specific privileges.
  • C、 WITH GRANT OPTION should be added to the statement.
  • D、 Separate GRANT statements are required for ORDERS and ORDERJTEMS tables.

正确答案:D

第10题:

Which of the following should be configured to provide priority to voice traffic?()

  • A、Port mirroring
  • B、DMZ
  • C、Qos
  • D、Trunking

正确答案:C

更多相关问题