海船船员考试

单选题What does the proof test load of an anchor chain demonstrate?()A Breaking strength of the chainB Strength of the chain to a specified limitC Adequate holding power for new bottom conditionsD Safe working load of the chain

题目
单选题
What does the proof test load of an anchor chain demonstrate?()
A

Breaking strength of the chain

B

Strength of the chain to a specified limit

C

Adequate holding power for new bottom conditions

D

Safe working load of the chain

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

In a combination chain and wire rope mooring system, the anchor chain is deployed at the anchor end of the line to ______.

A.increase fatigue life of the system

B.reduce the time to retrieve the line

C.increase the holding power

D.reduce the catenary


正确答案:C
在锚链与缆绳并用的系泊系统中,缆绳的作用主要是增强系泊强度。

第2题:

In anchor orders, “Up and down” means “()”.

  • A、The chain is not upright
  • B、The chain is upright
  • C、The chain is slack
  • D、The chain is not slack

正确答案:B

第3题:

what does “anchor is foul” mean?


正确答案:It means the anchor chain is across.

第4题:

单选题
In anchor orders, “Up and down” means “()”.
A

The chain is not upright

B

The chain is upright

C

The chain is slack

D

The chain is not slack


正确答案: A
解析: 暂无解析

第5题:

First,clean the ()(锚链舱)!

  • A、chain pipe
  • B、chain locker
  • C、hawse pipe
  • D、anchor

正确答案:B

第6题:

Lower the anchor until it is clear of ()(锚链筒).

  • A、chain locker
  • B、hawse pipe
  • C、windlass
  • D、anchor chain

正确答案:B

第7题:

After making some network changes you power off and then power on your Cisco router. What sequence of events occurs when a router is powered up?()

  • A、Perform POST, locate configuration statements, apply configuration statements, locate Cisco IOS software, and load Cisco IOS software.
  • B、Locate Cisco IOS software, load Cisco IOS software, locate configuration statements, apply configuration statements, and perform POST.
  • C、Test software routines, POST, load configuration files, load Cisco IOS software, test Cisco IOS software.
  • D、POST, locate Cisco IOS software, load the Cisco IOS software, locate configuration statements, and apply configuration statements.
  • E、Load and test IOS, load configuration files, test software routines, POST.

正确答案:D

第8题:

Prior to magnetic particle inspection of anchor chain,the chain should be ______.

A.Degaussed

B.Demagnetized

C.Soaked

D.Sandblasted


正确答案:D

第9题:

单选题
A permanent chain chasing system is used to().
A

clean anchor chain as it's hauled in

B

recover anchors which have lost their buoys

C

run and retrieve anchors

D

prepare anchor chain for inspection


正确答案: D
解析: 暂无解析

第10题:

单选题
The part of the anchor windlass that engages the anchor chain for lifting is called the ().
A

warping head

B

fairlead

C

wildcat

D

capstan


正确答案: B
解析: 暂无解析

更多相关问题