第1题:
The American Petroleum Institute recommends that connecting links and anchor shackles be inspected using ______.
A.visual examinations
B.magnetic particle inspection
C.dye penetrant inspection
D.x-ray inspection
第2题:
Before letting the anchor go, you should check that the ______.
A.chain is clear
B.anchor is clear of obstructions
C.wildcat is disengaged
D.All of the above
第3题:
A chain stripper is used to ______.
A.prevent chain from clinging to the wildcat
B.clean the marine debris from the chain
C.flake chain from a boat's chain locker
D.clean chain prior to an x-ray inspection
第4题:
First,clean the ()(锚链舱)!
第5题:
Lower the anchor until it is clear of ()(锚链筒).
第6题:
Prior to magnetic particle inspection of anchor chain,the chain should be ______.
A.Degaussed
B.Demagnetized
C.Soaked
D.Sandblasted
第7题:
In a combination chain and wire rope mooring system, the anchor chain is deployed at the anchor end of the line to ______.
A.increase fatigue life of the system
B.reduce the time to retrieve the line
C.increase the holding power
D.reduce the catenary
第8题:
The American Petroleum Institute recommends magnetic particle inspection for ______.
A.anchor chain
B.wire rope
C.connecting links
D.pendant wires
第9题:
In anchor orders, “Up and down” means “()”.
第10题:
clean anchor chain as it's hauled in
recover anchors which have lost their buoys
run and retrieve anchors
prepare anchor chain for inspection