removed from the anchor chain
connected to a buoy at the anchor
stripped back to the rig and secured
connected to a buoy halfway down the chain
第1题:
The length of chain between the anchor and the end of the pendant line is called the ______.
A.Pigtail chain
B.Thrash chain
C.Crown chain
D.Wear chain
第2题:
Before letting the anchor go, you should check that the ______.
A.chain is clear
B.anchor is clear of obstructions
C.wildcat is disengaged
D.All of the above
第3题:
On an anchor windlass,the wheel over which the anchor chain passes is called a______.
A.brake compressor wheel
B.devil's claw
C.wildcat
D.winch head
第4题:
First,clean the ()(锚链舱)!
第5题:
Lower the anchor until it is clear of ()(锚链筒).
第6题:
Prior to magnetic particle inspection of anchor chain,the chain should be ______.
A.Degaussed
B.Demagnetized
C.Soaked
D.Sandblasted
第7题:
In a combination chain and wire rope mooring system, the anchor chain is deployed at the anchor end of the line to ______.
A.increase fatigue life of the system
B.reduce the time to retrieve the line
C.increase the holding power
D.reduce the catenary
第8题:
Vessels lying afloat at buoys for more than 24 hours should use anchor chain for ______ and insurance wire for ______.
A.bow mooring/stern line
B.forward spring/after spring
C.forward breast rope/forward spring
D.slip rope/stern line
第9题:
In anchor orders, “Up and down” means “()”.
第10题:
clean anchor chain as it's hauled in
recover anchors which have lost their buoys
run and retrieve anchors
prepare anchor chain for inspection