with
in
to
on
第1题:
Prior to getting underway in fresh or brackish water,the Master must ______.
A.log the density of the water
B.secure all overboard discharges
C.take on fresh water ballast
D.clean the sides with fresh water
第2题:
Please supply us with 250 tons of fresh water.You are requested to deliver it on board ______.
A.Till Friday
B.On Friday at the latest
C.Until Friday afterwards
D.At Friday soonest
第3题:
My vessel will be able to take another 200 metric tons of cargo ______ the previons figure of my declaration.
A.in addition to
B.in connection with
C.in accordance with
D.in relation to
第4题:
污水井盖()
第5题:
I AM MAKING WATER means ______.
A.My vessel is leaking
B.My vessel is producing fresh water
C.My vessel is producing sea water
D.Sea water is de-salted on board my vessel
第6题:
Please supply 200 tons of fresh water ______ my ship.
A.with
B.in
C.to
D.on
第7题:
______is the number of millimeters by which the mean draft changes when a ship passes from salt water to fresh water,or vice versa,whilst floating at the loaded draft.
A.TPC
B.The Fresh Water Allowance
C.Parallel sinking of the ship
D.UKC
第8题:
Permission is requested to pump out about 200 tons of clean sea ballast water for ______ purposes.
A.safe manning
B.trimming
C.avoiding collision
D.preventing pollution
第9题:
水泥涂料用于淡水舱和双层底舱。()
第10题: