海船船员考试

单选题If two mooring lines are to be placed on the same bollard,which method is BEST?().A Place the eye from the forward line on the bollard and then place the eye from the second line directly over the firstB It makes no difference how the lines are placedC

题目
单选题
If two mooring lines are to be placed on the same bollard,which method is BEST?().
A

Place the eye from the forward line on the bollard and then place the eye from the second line directly over the first

B

It makes no difference how the lines are placed

C

Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollard

D

Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A storm is forecast for the area where your vessel is moored. For its safety you should put ______.

A.more slack in the mooring lines

B.a strain on the mooring lines

C.chafing gear on the mooring lines

D.grease on the mooring lines


正确答案:C

第2题:

If two mooring lines are to be placed on the same bollard,which method is BEST?______.

A.Place the eye from the forward line on the bollard and then place the eye from the second line directly over the first

B.It makes no difference how the lines are placed

C.Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollard

D.Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch


正确答案:C
假如两个系泊缆绳被套在同一个缆桩上面哪种方法最好?第一支缆绳系妥后,将第二支的眼环穿过第一个眼环后在系到缆桩上面。

第3题:

The best method for tying two lines of the same size together is by using a ______.

A.becket bend

B.two bowlines

C.single carrick bend

D.square knot


正确答案:D
把两条相同尺寸的绳子系在一起最好的方法是通过用平结。

第4题:

The ()(系泊缆绳)consist of a head line ,two breast lines, two spring lines and a stern line.

  • A、moor lines
  • B、mooring lines
  • C、unmoor lines
  • D、unmooring lines

正确答案:B

第5题:

Would you please ()the mooring lines ?

  • A、adjusted
  • B、adjusting
  • C、adjust
  • D、adjusts

正确答案:C

第6题:

Tensile stress is a result of two forces acting in ______.

A.opposite directions on the same line,tending to pull the material apart

B.opposite directions on the same line,tending to compress the object

C.opposite directions along parallel lines

D.the same direction along parallel lines


正确答案:A

第7题:

Each line has a large eye splice at the end. The eye is placed over a ()(系缆桩) .

  • A、bit
  • B、guard
  • C、quay
  • D、bollard

正确答案:D

第8题:

A position that is obtained by using two or more intersecting lines of position taken at nearly the same time,is a(n) ______.

A.fix

B.running fix

C.estimated position

D.dead-reckoning position


正确答案:A

第9题:

You should (松)()the mooring lines at the same time when the wind is big.

  • A、fasten
  • B、slack
  • C、fast
  • D、slacken

正确答案:B

第10题:

Each line has a large eye splice at the end. The eye is placed over a ().

  • A、bit
  • B、guard
  • C、quay
  • D、bollard

正确答案:D

更多相关问题