单选题A semisubmersible rig under tow should be ballasted down if().A motion begins to be excessiveB water begins to break over the pontoonsC period of roll exceeds 12 secondsD forward progress is halted by head wind

题目
单选题
A semisubmersible rig under tow should be ballasted down if().
A

motion begins to be excessive

B

water begins to break over the pontoons

C

period of roll exceeds 12 seconds

D

forward progress is halted by head wind

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

If a man falls overboard from a rig under tow,you should FIRST ______.

A.notify the tug

B.deploy life bouys

C.launch a boat

D.sound the general alarm


正确答案:B

第2题:

You intend to tow a barge with one tug and expect continuous high winds from the north.To reduce the yaw of your tow,you should ______.

A.reduce the draft of the barge

B.shorten one leg of the bridle

C.place bulky deck loads as far aft as possible

D.trim the barge down by the bow


正确答案:B

第3题:

A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started?

A.When the towing vessel enters the fog

B.When the drilling rig enters the fog

C.When the towing vessel can no longer be seen from the rig

D.Immediately


正确答案:D

第4题:

单选题
For operations in pack ice,a vessel should().
A

be on an even keel

B

be trimmed slightly by the head

C

have a drag of not more than 60 - 90 centimeters

D

be ballasted so the forefoot is near the surface


正确答案: B
解析: 暂无解析

第5题:

Apparent wind speed blowing across a vessel under tow can be measured by a(n)______.

A.barometer

B.wind vane

C.anemometer

D.Thermometer


正确答案:C
视风是通过安装在船上的风速仪测得的。

第6题:

To determine what navigation lights and day-shapes must be displayed on mobile offshore drilling units under tow,you should check the ______.

A.American Bureau of Shipping classification rules

B.International Regulations for Preventing Collisions at Sea

C.Safety of Life at Sea Convention

D.Minerals Management Service rules


正确答案:B

第7题:

When a winch breaks down,or some similar occurrence makes only one winch available at a hatch,which alternate rig would provide a temporary solution while repairs are made ________.

A.Frisco Rig

B.Split fall rig

C.West Coast Rig

D.Yard and stay jury rig


正确答案:D

第8题:

A semisubmersible rig under tow should be ballasted down if ______.

A.motion begins to be excessive

B.water begins to break over the pontoons

C.period of roll exceeds 12 seconds

D.forward progress is halted by head wind


正确答案:A

第9题:

If the freeboard is less than 9 meters, we should rig().

  • A、a gangway
  • B、a pilot ladder
  • C、rope ladder
  • D、gangway combined with pilot ladder

正确答案:B

第10题:

单选题
A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started? ()
A

When the towing vessel enters the fog

B

When the drilling rig enters the fog

C

When the towing vessel can no longer be seen from the rig

D

Immediately


正确答案: D
解析: 暂无解析