proceeding
overloading
collision
flooding
第1题:
a change-over chest
a head tank
a emergency bilge pump
an air cooler
第2题:
Open the bilge pump for inspection
Remove each of the manifold valves
Remove only the manifold valve to the affected bilge-well
Attempt to pump out another bilge well to determine if the entire system is affected
第3题:
What can be used to cover bilge before loading?
第4题:
turbine
screw
vane
ejector
第5题:
motor overload would open
relief valve would open
pump would eventually overheat
motor would overheat
第6题:
The ballast system
The salt water system
The bilge system
The domestic system
第7题:
dependent
in dependent
in series
in parallel
第8题:
Accidental flooding of the engine room bilges by the bilge main is prevented by( ).
A.stop-check valves installed in the bilge suction manifolds
B.using a positive displacement reciprocating bilge pump
C.installing educators in all bilge rose boxes
D.installing a swing check before each bilge valve
第9题:
turbine
screw
vane
ejector
第10题:
add strength to the bilge well strainer
permit rapid flow of water to the bilge wells
prevent cargo sifting into the bilge wells
prevent oil,water,or other liquid from reaching the cargo