injection valve
relief valve
discharge valve
inlet filter
第1题:
Before loading bulk grain, bilge wells must be covered to ______.
A.add strength to the bilge well strainer
B.permit rapid flow of water to the bilge wells
C.prevent cargo sifting into the bilge wells
D.prevent oil, water, or other liquid from reaching the cargo
第2题:
change from heavy fuel oil to diesel oil for mail engine
pumping oil bilge water
change sea chest form high level one to lower one
test emergency generator
第3题:
What can be used to cover bilge before loading?
第4题:
turbine
screw
vane
ejector
第5题:
The ballast system
The salt water system
The bilge system
The domestic system
第6题:
污水井()
第7题:
a change-over chest
a head tank
a emergency bilge pump
an air cooler
第8题:
Accidental flooding of the engine room bilges by the bilge main is prevented by( ).
A.stop-check valves installed in the bilge suction manifolds
B.using a positive displacement reciprocating bilge pump
C.installing educators in all bilge rose boxes
D.installing a swing check before each bilge valve
第9题:
dependent
in dependent
in series
in parallel
第10题:
turbine
screw
vane
ejector