availability of tools
shape of the hull
pressure exerted by the water
threat of progressive flooding
第1题:
(ii) Briefly discuss TWO factors which could reduce the rate of return earned by the investment as per the
results in part (a). (4 marks)
第2题:
______, where the ship is docked for hull coating renewal, and for any other required underwater work to be carried out, when the opportunity is taken to make other repairs.
A.Voyage repairs
B.Routine docking
C.Damage repairs
D.Conversion
第3题:
Which is not a consideration in a make or buy decision?
A Cost factors (least cost alternatives)
B Competitors' method of sourcing
C Existence of sufficient administration/technical personnel
D Political and social factors
E None of the above.
第4题:
第5题:
The two courses of action if the underwater hull of a ship is severely damaged are to plug the openings and to ______.
A.dewater the compartment
B.establish and maintain flooding boundaries
C.secure power to the compartment
D.counter flood to maintain even keel
第6题:
A. Diagnose and repair a data file corruption offline.
B. Diagnose and repair a data file corruption online.
C. Diagnose and repair failures on a standby database.
D. Recover from failures in the Real Application Cluster (RAC) environment.
第7题:
A.line quality
B.distance from the CO
C.brand of xDSL modem
D.number of twisted-pair wires used
第8题:
153 Which is not a consideration in a make or buy decision?
A. Cost factors (least cost alternatives)
B. Competitors' method of sourcing
C. Existence of sufficient administration/technical personnel
D. Political and social factors
E. None of the above
第9题:
第10题: