With switches
With a governor on the engine
With fuses or circuit breakers
By using heavy wire
第1题:
A.The HVDC (high voltage DC) transmission
B.The EHV (extra-high voltage) AC transmission
C.The AC distribution
D.Generators
第2题:
A. Netflow
B. WCCP
C. IP SLA
D. SNMP
第3题:
Creation of project objectives:
A.allows for data collection and analysis and progress reporting against which standards of performance can be measured.
B.is accomplished by selection of measurable variables against which performance can be judged.
C.is required before funding of the project by the project sponsor.
D.all of the above.
E.A and B only
第4题:
The electric fan has blown away the terrible smell in the hall,()?
第5题:
If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor ______.
A.when the line pull reaches the rated winch capacity
B.after the line pull exceeds the rated winch capacity
C.after a short build-up of torque
D.immediately
第6题:
第7题:
Electrical circuits are protected against overheating by means of a/an _______.
A.circuit breaker
B.amplifier
C.diode (二极管)
D.capacitor
第8题:
Thanks to the policy, the government is sending home-electric machines to farmers, they can pay much ________ ( 少的) money.
第9题:
第10题:
public class MethodOver { public void setVar (int a, int b, float c) { } } Which two overload the setVar method?()