海船船员考试

单选题For Vee-form engines, () is shaped to given two slopping surface on which () are placed at the correct relative angle to each other.A the bottom of the column;the cylinder blocksB the top of the column;the cylinder headsC the top of the column;the cyli

题目
单选题
For Vee-form engines, () is shaped to given two slopping surface on which () are placed at the correct relative angle to each other.
A

the bottom of the column;the cylinder blocks

B

the top of the column;the cylinder heads

C

the top of the column;the cylinder blocks

D

the bottom of the column;the cylinder heads

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The two words" collaborator" and "accomplice" are examples given to illustrate that synonyms may differ._____.

A in style

B in their emotive or evaluative meaning

C in their collocation

D slightly in what they mean


答案:B

第2题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

A. operator training

B. cache size of the two clusters

C. fibre bandwidth capability between the sites

D. number of stacked tape drives attached to each cluster


参考答案:C

第3题:

People will be able to fly from one planet to another in ().

A.little nasty arrow-shaped tubes

B.nasty little arrow-shaped tubes

C.arrow-shaped little nasty tubes

D.arrow-shaped little nasty tubes


参考答案:B

第4题:

材料:

With the engines on stand-by,orders were given to cut the remaining forward lines at 0755 hours,the starboard engine was put on“slow astern”and the helm to“hard a starboard”. When the forward lines were cut,the bow was blown off and swung away from the quay under the influence of the wind and,combined with the effect of the engine going astern on the after spring,canted the bow to port,until a heading of North was reached with the vessel&39;s stern approximately 15 meters off the dock face.

The engines were put to half astern at 0810 hours and with the bow continuing to swing to port,the after back-spring parted with the stern about 20 meters clear of the wharf.Orders were given to cut the remaining 5 stern lines.This was accomplished by 0818 hours,at which time the end of the pier was abeam of the bridge and the vessel was heading in a NW-ly direction. Both engines were placed to full astern with the shaft turning 80-90 revolutions.As the UNISOL was unable to gain sternway and with high seas at the end of the breakwater,the Pilot feared that the vessel&39;s starboard quarter was in danger of striking the breakwater.

Hence the engines were stopped at 0827 hours,and orders were given to“let go port anchor to 2 shackles in the water”,but about 4 shackles ran out before the brake could be fully applieD、At 0828 hours,orders were given to shorten up on the anchor cable,the telegraph put on full ahead and the helm to hard to port. When the engines responded at 0829 hours,the anchor chain was seen to be stretched out on the port beam with a great deal of weight on it and the ship&39;s head was 220° gyro with the vessel swinging to port.

The anchor was hove short to 2 shackles in the water by 0835 hours,and the vessel continued to drift westwards with 80-90(full ahead)revolutions on the engine.At this stage,orders were given to pay out the cable,which was paid out to 5 shackles in the water by 0838 hours,but that too failed to arrest the westward drift of the vessel.

问题:

The wind was probably blowing from ________.

A.West

B.East

C.North

D.South

The vessel had ________.A.one engine

B.two engines

C.three engines

D.four engines

According to the passage,________.A.the bow of the vessel parted the pier first

B.the stern of the vessel parted the pier first

C.the beam of the vessel parted the pier first

D.it can not be concluded which part of the vessel parted the pier first

It can be concluded that ________.A.the vessel was lying portside along the pier

B.the vessel was lying starboardside along the pier

C.the vessel was lying at a buoy

D.the vessel was anchored

请帮忙给出每个问题的正确答案和分析,谢谢!


问题 1 答案解析:B


问题 2 答案解析:B


问题 3 答案解析:A


问题 4 答案解析:B

第5题:

材料:MV UNISOL Grounded

With the engines on stand-by,orders were given to cut the remaining forward lines at 0755 hours,the starboard engine was put on slow astern and the helm to hard a starboard.

When the forward lines were cut,the bow was blown off and swung away from the quay under the influence of the wind and,combined with the effect of the engine going astern on the after spring,canted the bow to port,until a heading of North was reached with the vessel&39;s stern approximately 15 meters off the dock face.

The engines were put to half astern at 0810 hours and with the bow continuing to swing to port,the after back-spring parted with the stern about 20 meters clear of the wharf.Orders were given to cut the remaining 5 stern lines.This was accomplished by 0818 hours,at which time the end of the pier was abeam of the bridge and the vessel was heading in a NW&39;ly direction.

Both engines were placed to full astern with the shaft turning 80-90 revolutions.As the UNISOL was unable to gain sternway and with high seas at the end of the breakwater,the Pilot feared that the vessel&39;s starboard quarter was in danger of striking the breakwater.Hence the engines were stopped at 0827 hours,and orders were given to let go port anchor to 2 shackles in the water,but about 4 shackles ran out before the brake could be fully applied.At 0828 hours,orders were given to shorten up on the anchor cable,the telegraph put on full ahead and the helm to hard to port.When the engines responded at 0829 hours,the anchor chain was seen to be stretched out on the port beam with a great deal of weight on it and the ship&39;s head was 220° gyro with the vessel swinging to port.

The anchor was hove short to 2 shackles in the water by 0835 hours,and the vessel continued to drift westwards with 80-90 (full ahead) revolutions on the Engine.At this stage,orders were given to pay out the cable,which was paid out to 5 shackles in the water by 0838 hours,but that too failed to arrest the westward drift of the vessel.

At 0840 hours,December 7,1983,with the ship&39;s head on 180°,the UNISOL grounded on a rocky bottom,forward of the main engine on her star board side,in approximate position 48°20′30.5″ North,64°40′02″West.A spout of water mixed with oil about 60 centimeters in diameter and 2.5-3 meters high above the engine room bottom plating was observed,and at which time the main engines seemed to slow down.

问题:the wind was blowing ______.

A.West

B.East

C.North

D.south

The vessel had ______.A.one engine

B.two engines

C.three engines

D.fore engines

According to the passage, ______.A.The bow of the vessel parted the pier first

B.The stern of the vessel parted the pier first

C.The beam of the vessel parted the pier first

D.It can not tell which part of the vessel parted the pier first

It can be concluded that ______ .A.the vessel was lying portside along the pier

B.the vessel was lying starboardside along the pier

C.the vessel was lying at a buoy

D.the vessel was anchored

请帮忙给出每个问题的正确答案和分析,谢谢!


问题 1 答案解析:A


问题 2 答案解析:B


问题 3 答案解析:A


问题 4 答案解析:B

第6题:

Given:Which two, independently, will allow Sub to compile?()

A.

B.

C.

D.

E.


参考答案:C, D

第7题:

Vee-type engines have the connecting rods from two cylinders connected to each _____ of the crankshaft.

A.throw

B.web

C.main bearing

D.deflection


正确答案:A

第8题:

She has two words in her given name instead of just one ______ mine.

A、as

B、with

C、to

D、like


标准答案:D

第9题:

Buckler plates are ______.

A.Triangular-shaped plates connecting the bull chain to the topping lift

B.Metal plates secured over the tops of the hawsepipes

C.Faired shell plates with curvature in two directions

D.Sheets of dunnage used to prevent heavy cargo from buckling the deck plates


正确答案:B

第10题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

  • A、operator training
  • B、cache size of the two clusters
  • C、fibre bandwidth capability between the sites
  • D、number of stacked tape drives attached to each cluster

正确答案:C

更多相关问题