Planning
Executing
Monitoring and Controlling
Closing
第1题:
The( )Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project’s requirements. A.Planning B.Executing C.Monitoring and Controlling D.Close-out
第2题:
A. Each process has its own protected memory space
B. Each process is started manually by the user at boot
C. Aall processes are dependent on each other
D. Multiple processes allow each routing protocol to be independent
第3题:
The(71) is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarized. The workflow enactment service is the heart of a workflow system which consists of several(72). In a workflow system, a process is specified using the process definition tool. Usually, processes are defined in terms of a(73), which consists of(74) indicated using a circle, and(75) shown as a rectangle. These two components can be linked by means of a directed arc.
A.waterfall model
B.workflow reference model
C.evolutionary model
D.spiral model
第4题:
第5题:
A.It is locally significant
B.It is globally significant
C.It is needed to identify a unique instance of an OSPF database
D.It is an optional parameter required only if multiple OSPF processes are running on the router
E.All routers in the same OSPF area must have the same process ID if they are to exchange routing information
第6题:
A. Each process has its own protected memory space.
B. Each process is started manually by the user at boot.
C. All processes are dependent on each other.
D. Multiple processes allow each routing protocol to be independent.
第7题:
()is a collection of data sets,which is so large and complet that is because difficult to process using on hand database management tools or traditional data peocessing applications
A.big data
B.cluster
C.parallel computing
D.data warehouse
第8题:
The(69)Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project's requirements.
A.Plannlng
B.Executing
C.Monitoring and Controlling
D.Closing
第9题:
第10题: