Connect to the network,power on the server,Micro-Partition the server
Connect to the HMC,power on the server,Micro-Partition the server,connect to the network
Power on server,connect to the network,Micro-Partition the server,connect to the HMC
Power on the server,connect to the HMC,Micro-Partition the server,connect to the network
第1题:
You are preparing to install Windows 2000 Server on a new computer. The computer is connected to a network that includes Windows 98 computers and Windows 2000 Server computers.
You want to install Windows 2000 Server from source files that are located on a server on the network.
What should you do?
A.Start the new computer by using a Windows 98 network boot disk. Connect to the network server. Run Winnt32.exe.
B.Start the new computer by using Windows 98 network boot disk. Connect to the network server. Run Winnt.exe.
C.On a Windows 2000 Server computer, use Makebt32.exe to create installation startup disk. Start the new computer by using the first disk.
D.On a Windows 2000 computer, format a floppy disk. Copy NTLDR, boot.ini, Ntdetect.com, Ntbootdd.sys to this disk. Start the new computer by using the disk.
第2题:
Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()
第3题:
You want to install Windows 2000 Professional on 20 new PXE compliant computers, which do not have operating systems installed. You create a RIS image and load the image onto the RIS server and then start the new computers. You find that the new computers cannot connect to the RIS server. You verify that existing client computers on the network can connect to network servers.
What should you do? (SELECT AND PLACE)
第4题:
ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?()
第5题:
Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()
第6题:
Users report that they are unable to connect to a server. An administrator confirms that it is unreachable across the network. Other administrators have been working in the server room throughout the day. Which of the following is the NEXT step the administrator should take?()
第7题:
Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()
第8题:
You are the administrator for your company's network. The network is configured as shown in the exhibit.
You want to install Windows 2000 Professional on 20 new PXE-compliant computers on the marketing segment of your network. The new computers do not have operating systems installed.
You create a RIS image. You load the image onto the RIS server. You then start the new computers.
You find that the new computers cannot connect to the RIS server. You verify that the new computers cannot connect to the RIS server. You verify that the existing client computers in the network can connect to the network servers, including the RIS server. You want to enable the new computers to connect to the RIS server.
What should you do?
A.Add a Windows 2000 Server computer running WINS to the network.
B.Add a Windows 2000 Server computer running DHCP to the network.
C.Add the domain Everyone group to the RIS OS image security settings.
D.Place the new computers on the same segment as the RIS server.
第9题:
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()
第10题:
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()