儿科护理专业实践能力

单选题To implement the optional phase zero when using eap-fast for authentication, which of the following parameters must be set on the cisco secure acs?()A eap-fast master serverB allow automatic pac provisioningC client initial messageD authority id info

题目
单选题
To implement the optional phase zero when using eap-fast for authentication, which of the following parameters must be set on the cisco secure acs?()
A

eap-fast master server

B

allow automatic pac provisioning

C

client initial message

D

authority id info

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

While paralleling two AC generators using synchronizing lamps only, both lamps will go dark when the generators are______.

A.running at the same speed

B.grounded

C.of the same polarity

D.in phase


正确答案:D

第2题:

Which of the following options lists the steps in PPP session establishment in the correct order?()

  • A、Optional authentication phase, link establishment phase, network layer protocol phase.
  • B、Network layer protocol phase, link establishment phase, optional authentication phase.
  • C、Network layer protocol phase, optional authentication phase, link establishment phase.
  • D、Link establishment phase, network layer protocol phase, optional authentication phase.
  • E、Link establishment phase, optional authentication phase, network layer protocol phase.
  • F、Optional authentication phase, network layer protocol phase, link establishment phase.

正确答案:E

第3题:

Viruses usually have two phases to their execution, the infection phase and the(75)phase. The later phase is optional, since stone viruses simply reproduce.

A.reproduce

B.proliferation

C.defend

D.attack


正确答案:D
解析:译文:病毒在执行的过程中通常有两个阶段:感染阶段和攻击阶段。有些病毒只进行简单的复制,因此可能没有攻击阶段。

第4题:

Which of the following commands configures the cisco 3845 integrated services router to allow eap-fast authentication using wds?()

  • A、router (config)# wlccp authentication-server infrastructure eap group_1
  • B、router (config)# wlccp authentication-server infrastructure eap-fast group_1
  • C、router (config)# wlccp authentication-server client eap-fast group_1
  • D、router (config)# wlccp authentication-server client eap group_1

正确答案:D

第5题:

Eap-fast provides a secure tunnel during phase one to protect the user’s authentication credentials. Which of these entities initializes the secure tunnel?()

  • A、x.509 certificate
  • B、generic token card
  • C、pre shared key
  • D、protected access credential

正确答案:D

第6题:

Which phase includes testing operational processes and procedures in accordance with the Cisco Unified Communications operations plan()

  • A、Operate
  • B、Design
  • C、Deploy
  • D、Implement

正确答案:D

第7题:

To implement the optional phase zero when using EAP-FAST for authentication, which of the following parameters must be set on the Cisco Secure ACS?()

  • A、EAP-FAST master server
  • B、Allow automatic PAC provisioning
  • C、client initial message
  • D、authority ID info

正确答案:B

第8题:

Which of the following statements is correct?

A.The definition phase results in the Software Requirements Specification.

B.Testing is optional in software life cycle.

C.CASE tools can only aid in the design phase of a software life cycle.

D.A change during a later phase does not require the documentation of all earlier phases to be updated.


正确答案:A

第9题:

EAP-FAST provides a secure tunnel during Phase One to protect the user’s authentication credentials. Which of these entities initializes the secure tunnel?()

  • A、x.509 certificate
  • B、generic token card
  • C、preshared key
  • D、Protected Access Credential

正确答案:D

第10题:

Which three of these service components are in the implement phase?()

  • A、Staging
  • B、Business Requirements Development
  • C、Post Implementation Support Handoff Meeting
  • D、Detailed Design Development
  • E、Staff Training
  • F、Incident Management

正确答案:A,C,E

更多相关问题