IBM(000-104)

单选题A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()A In the HMC Properties, select the options to allow processor sharing when

题目
单选题
A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()
A

In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.

B

In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.

C

In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.

D

In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.

参考答案和解析
正确答案: D
解析: 暂无解析
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()

  • A、One single port Ethernet adapter
  • B、Four dual port Ethernet adapters
  • C、Two single port Ethernet adapters
  • D、Eight single port Ethernet adapters

正确答案:A

第2题:

A system administrator has been instructed to attach storage in their client LPARs, in a Power 770, with fibre channel adapters using N_port ID virtualization (NPIV). Which of the following partitions has the minimum requirements to utilize virtual fibre channel?()

  • A、LPAR-A with 1Gb FC HBA and SAN connection
  • B、LPAR-B with 2Gb FC HBA and SAN connection
  • C、LPAR-C with 4Gb FC HBA and SAN connection
  • D、LPAR-D with 8Gb FC HBA and SAN connection

正确答案:B

第3题:

An administrator wants to deploy a complex LPARenvironment on a 595.What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()

A.LPAR Planning Tool.

B.System Planning Tool.

C.LPAR Validation Tool.

D.System Validation Tool.


参考答案:B

第4题:

A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()

  • A、A CD or DVD with installation media
  • B、An internal SCSI adapter in the target LPAR
  • C、An Ethernet adapter for access to an FTP server
  • D、Advanced Power Virtualization feature of the p5 590

正确答案:A

第5题:

A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR. Which of the following should be added for the seventh LPAR boot device?()

  • A、An additional 7311-D10 drawer
  • B、An adapter to boot off a SAN device
  • C、An additional disk to the media bay
  • D、Two disks to the internal configuration

正确答案:B

第6题:

An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB  LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can  however allocate 512 MB that is free to LPAR 1 on the 570.  What is the most likely cause of this failure when dynamically moving memory?()

  • A、 Maxperm% is set too low on LPAR 2
  • B、 Insufficient paging space on LPAR 1
  • C、 Service IBM.DRM is unavailable on LPAR 1
  • D、 Insufficient pinnable memory frames available on LPAR 2

正确答案:D

第7题:

An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()

  • A、LPAR Planning Tool.
  • B、System Planning Tool.
  • C、LPAR Validation Tool.
  • D、System Validation Tool.

正确答案:B

第8题:

Company.com wants to put two Micro-Partitions on a p5-570 and attach to a SAN. What is the best LPAR configuration to maximize SAN availability using four Host Bus Adapters (HBAs)?()

  • A、Two HBAs assigned to each redundant VIOS which provides VSCSI access to LUNs
  • B、Two HBAs assigned to each LPAR with each LPAR owning HBAs on the same PCI busses
  • C、Two HBAs assigned to each LPAR with each LPAR owning HBAs on separate PCI busses
  • D、One HBA assigned to each LPAR and two HBAs assigned to a VIOS providing VSCSI access to LUNs

正确答案:A

第9题:

An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()

  • A、LPAR Planning Tool.
  • B、System Planning Tool.
  • C、LPAR Validation Tool.
  • D、System Validation Tool.

正确答案:B

第10题:

Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()

  • A、Configure a Shared Ethernet Adapter on the Virtual I/O Server.
  • B、Use the same virtual LAN ID on each LPAR.
  • C、Set up IP routing through an LPAR on each system.
  • D、Set up an IP firewall through an LPAR on each system.

正确答案:A

更多相关问题