问题:单选题Which factor has the greatest impact on the estimated per unit labor cost for a project?()A Historical informationB Use of outside vendorsC Change control processesD Human resource skill level requirements
Wednesday, January 24, 2024
问题:单选题Who is responsible for authorizing closure of the project?()A Project ManagerB StakeholderC CustomerD Executive Sponsor
Saturday, February 10, 2024
问题:单选题After upgrading a server motherboard to the latest firmware revision, configuring LAN access in the SSU (System Setup Utility) fails. Which action should be taken FIRST to correct this problem?()Areplace the NICBinstall the latest SSU (System Setup Utility) versionCupgrade the firmware on the NICDassign the NIC a static IRQ in the SSU (System Setup Utility)
Sunday, December 24, 2023
问题:单选题Within Information Technology projects, communications between the project manager and the project team members should take place:()A by written and oral communication.B via a weekly status report.C through the formal chain of command.D with approved template forms.
Tuesday, April 23, 2024
问题:多选题Which three should be documented after upgrading a SCSI RAID controller?()Adisk utilizationBinstallation dateCadapter baselinesDlocation slot of the RAID controllerEstatus of the adapter card installationFRAID controller information (warranty, specifications etc.)
Friday, December 8, 2023
问题:单选题The last deliverable at the Close Out meeting is:()A source code.B passwords.C lessons learned.D test results.
问题:单选题Which RAID standard combines data striping across drives with mirroring?()ARAID 0+1BRAID 1+5CRAID 3DHybrid RAID 5+
问题:单选题What is the MOST accurate way to determine a project’s duration before execution?()A The project manager performs all estimatesB Incorporate each individual worker’s estimatesC Acquire expert estimatesD There is no way to determine the duration
问题:单选题What is a reason for reviewing the user requirements document with the client?()A To gain the client’s acceptance of the detailed designB To verify mutual understanding of project resourcesC To verify mutual understanding of the detailed project planD To verify mutual understanding of targeted product performanceE To verify mutual understanding of the tests that will be done after the product is completed
问题:单选题Which throughput does a 33 MHz, 33-bit bus have?()A132 MbpsB256 MbpsC264 MbpsD450 Mbps
问题:单选题A large corporation is concerned about the amount of time it takes to back up their main file server. They are also concerned that their IT technician frequently forgets to change the backup tapes, thereby leaving the company open to data loss. Which backup system would solve both problems?()ARAIDBtape libraryCoptical storageDdisk to disk to tape
问题:单选题Why is it important to have a final meeting on a project that has been cancelled?()A Document lessons learnedB Assign responsibilityC Close budgetD Begin new project
问题:单选题Which backup solution is the MOST appropriate for backing up a payload from a corporation with multiple servers and approximately 300 GB of data?()Amultiple AIT (Advanced Intelligent Tape) drives configured for each serverBa standalone LTO (Linear Tape-Open) drive configured for all serversCstandalone DAT (Digital Audio Tape) drives configured for each serverDa tape library unit with more then one DAT (Digital Audio Tape) drive configured for all serversEa tape library unit with more the one SDLT (SuperDLT) drive configured for all servers
Sunday, November 26, 2023
问题:多选题A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem. They are running two 24-port autosensing 10/100 hubs, tied together with a standard Ethernet crossover cable in port 24. The server is running IPX. After adding a second network card and plugging one card into each hub, they have not seen any performance improvement. Which two are likely reasons why implementing network adapter teaming has not improved performance?()AAdapter teaming is designed to work with switches.BAdapter teaming only functions with gigabit network cards.CAdapter teaming only provides fault tolerance, not additional bandwidth.DAdapter teaming only works with IPX when using switches and network cards with special features that support teaming.
问题:单选题Which is the MOST effective method for generating support for your project plan?()A Requiring stakeholders to sign-off on project plan componentsB Requesting input from all stakeholders during the planning processC Providing an open line of communication regarding the projectD Clearly illustrating how the project relates to the company’s objectives
问题:单选题Why does a project manager need an executive sponsor?()A To keep the project team focused on its workB To provide behind-the-scenes assistance with organizational commitment and supportC To sign-off on user requirementsD To negotiate contracts with outside vendors