To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.
Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.
Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on the
Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from
第1题:
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
第2题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第3题:
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()
A.An additional switch for the new HMC
B.Asynchronous adapters on the new HMC
C.The two 570 servers are directly connected to the new HMC
D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
第4题:
Which of the following interfaces is required to implement Workload Partition Mobility? ()
第5题:
Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()
第6题:
A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy. Which of the following statements correctlydescribes the dual HMC environment? ()
第7题:
Which of the following can deploy system plans generated by the IBM System Planning Tool (SPT)?()
第8题:
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
第9题:
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
第10题:
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()