Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs
Move the existing physical network and storage adapters to the new system and virtualize the I/O using a single VIO Server.
Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC connectors and dual HBAs.
Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC connectors and the other with dual HBAs.
第1题:
A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()
第2题:
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
第3题:
A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()
第4题:
A customer has a new Power 720 with PowerVM Standard Edition. They plan to migrate their single-partition POWER5 550 to the new Power 720. How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()
第5题:
Company.com has a new computer room that will be used to house a new HACMP cluster. Onceof the outstanding features of the new computer room was the new large air conditioner. This unit has enough excess capacity for more than double the planned amount of equipment. Another feature of this computer room was the dual electric supplies to the room housed in two separate power panels. How would this impact the overall availability of the environment?()
第6题:
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
第7题:
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
第8题:
Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems?()
第9题:
A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility. Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()
第10题:
A customer plans to consolidate multiple business unit applications on a single Power Systems server. The maximum number of cores which can be used by each business unit must be limited by creating shared processor pools. What is the minimum PowerVM Edition which provides this feature?()