● Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance.(75) is a method that analyze all the costs incurred over the life of the product by i

题目

● Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance.(75) is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.

(75)

A.Cost-Benefit analysis

B.Control charts

C.Quality function deployment

D.Cost of quality analysis

参考答案和解析
正确答案:D
试题(75)分析
 质量分析成本Cost of quality analysis是对产品或服务进行需求一致性分析所产生的成本;
 成本效益分析Cost-Benefit analysi是通过比较项目的全部成本和效益来评估项目价值的一种方法;
 控制图Control charts是项目质量控制方法;
 质量功能展开Quality function deployment是把顾客或市场的要求转化为设计要求、零部件特性、工艺要求、生产要求的多层次演绎分析方法
 因此,因此选D
参考答案
(75)D
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

What is the relative priority of project Cost, Schedule and Quality?

A . 1)Cost - 2)Schedule - 3)Quality

B . 1)Quality - 2)Schedule - 3)Cost

C . 1)Quality - 2)Cost - 3)Schedule

D . 1)Schedule - 2)Quality - 3)Cost

E . All are of equal priority


正确答案:E

第2题:

2 The Work Breakdown Structure (WBS) is the basis for communicating:

A. Project scope, cost control, schedule, quality

B. Project objectives, dependencies, plan, cost control

C. Project scope, schedule, staffing, cost control

D. Project scope, quality, schedule, dependencies

E. Project budget, schedule, risk factors, work assignments


正确答案:A

第3题:

Project tradeoffs are usually made by comparing _____ and constraints.

ATime, cost, and quality

BTime, risk, and quality

CRisk, quality, and manpower availability

DCost, quality, and technical performance

ECost, quality, and risk


正确答案:D

 

第4题:

● The Work Breakdown Structure (WBS) is the basis for communicating:

A Project scope, cost control, schedule, quality

B Project objectives, dependencies, plan, cost control

C Project scope, schedule, staffing, cost control

D Project scope, quality, schedule, dependencies

E Project budget, schedule, risk factors, work assignments.


正确答案:A

第5题:

85 Project tradeoffs are usually made by comparing _____ and constraints.

A. Time, cost, and quality

B. Time, risk, and quality

C. Risk, quality, and manpower availability

D. Cost, quality, and technical performance

E. Cost, quality, and risk


正确答案:D

第6题:

120 The Work Breakdown Structure (WBS) is the basis for communicating:

A. Project scope, cost control, schedule, quality

B. Project objectives, dependencies, plan, cost control

C. Project scope, schedule, staffing, cost control

D. Project scope, quality, schedule, dependencies

E. Project budget, schedule, risk factors, work assignments


正确答案:A

第7题:

3 Project tradeoffs are usually made by comparing _____ and constraints.

A. Time, cost, and quality

B. Time, risk, and quality

C. Risk, quality, and manpower availability

D. Cost, quality, and technical performance

E. Cost, quality, and risk


正确答案:D

第8题:

The Work Breakdown Structure (WBS) is the basis for communicating:

A.Project scope, cost control, schedule, quality

B.Project objectives, dependencies, plan, cost control

C.Project scope, schedule, staffing, cost control

D.Project scope, quality, schedule, dependencies

E.Project budget, schedule, risk factors, work assignments.


正确答案:A
A

第9题:

● Project tradeoffs are usually made by comparing _____ and constraints.

A Time, cost, and quality

B Time, risk, and quality

C Risk, quality, and manpower availability

D Cost, quality, and technical performance

E Cost, quality, and risk


正确答案:D

第10题:

汉译英:“数量;质量”,正确的翻译为( )。
A. quality ; quarantine B. quantity ; quarantine
C. quality ; quantity D. quantity ; quality


答案:D