When several salvors are on-scene at the same time to assist a vessel that has not been abandoned,which principal governs the decision as to which one's services will be accepted ________.A.The Master of the ship needing assistance has the absolute right

题目

When several salvors are on-scene at the same time to assist a vessel that has not been abandoned,which principal governs the decision as to which one's services will be accepted ________.

A.The Master of the ship needing assistance has the absolute right to decide

B.The first salvor on-scene has the prior claim providing he has adequate facilities to assist the vessel needing assistance

C.The salvors must agree to a division of any salvage among themselves with the major share allotted to those doing the most work

D.The first salvor on-scene has the absolute right to provide assistance;however,he is liable if the ship is lost due to his lack of experience,equipment,etc

如果没有搜索结果,请直接 联系老师 获取答案。
如果没有搜索结果,请直接 联系老师 获取答案。
相似问题和答案

第1题:

During OSPF adjacency formation, in which state is a router in when an OSPF hello packet has been sent but bi-directional communication has not been achieved?()

A.A

B.B

C.C

D.D


参考答案:A

第2题:

Maritime Declaration of Health is generally prepared by the Master ______.

A.when his vessel is arriving at a foreign port

B.when his vessel is leaving a foreign port

C.after his vessel has left a foreign port

D.after his vessel has arrived at a port


正确答案:A

第3题:

An overtaken vessel means a vessel________.

A.which has been overtaken by another vessel

B.which is going to overtake another vessel

C.which has overtaken another vessel

D.which is going to be overtaken by another vessel


正确答案:A
已被追越船意思是被别船追越的船。Overtakingvessel------追越船Overtakenvessel------已被追越的船Vesselbeingovertaken------正在被追越的船

第4题:

The most crucial time for project risk assessment is ( ).

  • A、when a problem surfaces
  • B、during the planning phase
  • C、during the close-out phase
  • D、after the project schedule has been published

正确答案:B

第5题:

The Master of any vessel bound on a voyage must apply to a district court when an allegation of unseaworthiness has been made to the Master by ______.

A.Any member of the crew of the vessel

B.Any two officers of the vessel and a majority of the crew

C.The First and Second Officers of the vessel or a majority of the crew

D.The First Officer of the vessel


正确答案:C

第6题:

Where there has been delay in carrying goods, the measure of damages ________ generally the difference between the market value of the goods at the time when they ought to have been delivered and the time when they were in fact delivered.

A.have

B.has

C.are

D.is


正确答案:D

第7题:

That the possible deformation or fracture of the side shell plating or supporting structure due to the lightering activities between the time of the last annual survey and the departure on its last voyage is a potential contributing factor ______.

A.deserves further consideration

B.has been determined by ABS

C.reveals that the vessel experienced heavy losses

D.has been the general consideration of ABS surveyors


正确答案:A

第8题:

The most crucial time for project risk assessment is (75) .A.when a problem surfacesSXB

The most crucial time for project risk assessment is (75) .

A.when a problem surfaces

B.during the planning phase

C.during the close-out phase

D.after the project schedule has been published


正确答案:A
项目风险评估最重要的时间是:当问题呈现时在规划阶段在收尾阶段在项目进度发布后

第9题:

For GMDSS,when may a compulsory vessel not be allowed to leave port ________.

A.When the vessel is in an overloaded condition

B.When the vessel has arranged for both duplication of equipment AND shore-based maintenance

C.When the vessel has replaced a required piece of GMDSS-related equipment but its performance has not been verified or logged

D.When the vessel is carrying only two licensed GMDSS Radio Operators and is capable of performing all required functions


正确答案:C

第10题:

When creating a list of vendors, which of the following information should be included?()

  • A、Vendor customer satisfaction ratings
  • B、OEM contact information
  • C、Time vendor has been in business
  • D、Annual spending budget with the vendor

正确答案:B